Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lighting equipment, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0046 #13 Y:2024 Use solar heat to make electricty $70,016 $432,400
MU0046 #12 Y:2024 Apply for tax-free status for energy purchases $3,810 -
MU0046 #11 Y:2024 Insulate glazing, walls, ceilings, and roofs $1,303 $13,605
MU0046 #10 Y:2024 Close holes and openings in building such as broken windows $844 $555
MU0046 #09 Y:2024 Use photocell controls $74 $706
MU0046 #08 Y:2024 Turn off equipment when not in use $426 -
MU0046 #07 Y:2024 Use or replace with energy efficient substitutes $320 $1,932
MU0046 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $814 -
MU0046 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $160 $17
MU0046 #04 Y:2024 Install compressor air intakes in coolest locations $340 $2,498
MU0046 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,153 -
MU0046 #02 Y:2024 Recover heat from exhausted steam, hot air or hot water $7,422 $9,923
MU0046 #01 Y:2024 Recover heat from exhausted steam, hot air or hot water $465 $484
AM0821 #06 Y:2021 Make a practice of turning off lights when not needed $425 $52
AM0821 #05 Y:2021 Eliminate or reduce compressed air usage $1,057 $12
AM0821 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,780 $4,216
AM0821 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,460 $1,000
AM0821 #02 Y:2021 Pay utility bills on time $3,204 -
AM0821 #01 Y:2021 Apply for tax-free status for energy purchases $17,688 $5,000
GT0952 #09 Y:2020 Optimize plant power factor $300 $1,565