Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household laundry equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1026 #06 Y:2021 Chill water to the highest temperature possible $817 -
UD1026 #05 Y:2021 Utilize a less expensive cooling method $42,343 $88,894
UD1026 #04 Y:2021 Use cooling tower or economizer to replace chiller cooling $441,982 $200,000
UD1026 #03 Y:2021 Reduce space conditioning during non-working hours $58,812 $45,000
UD1026 #02 Y:2021 Install outside air damper / economizer on hvac unit $174,302 $45,000
UD1026 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $4,601 -
IC0138 #09 Y:2008 Repair or replace steam traps $14,928 $1,500
IC0138 #08 Y:2008 Reduce the pressure of compressed air to the minimum required $158 -
IC0138 #07 Y:2008 Analyze flue gas for proper air/fuel ratio $3,513 -
IC0138 #06 Y:2008 Analyze flue gas for proper air/fuel ratio $2,154 -
IC0138 #05 Y:2008 Use most efficient type of electric motors $4,556 $20,784
IC0138 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $18,232 $143,228
IC0138 #03 Y:2008 Install occupancy sensors $927 $3,982
IC0138 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $422 $537
IC0138 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $32,199 $66,929
IA0214 #07 Y:1998 Eliminate/reduce an operation $97,749 $800
IA0214 #06 Y:1998 Add equipment/ operators to reduce production bottleneck $176,000 $575,000
IA0214 #05 Y:1998 Use closed cycle process to minimize waste water production $14,369 $4,297
IA0214 #04 Y:1998 Utilize higher efficiency lamps and/or ballasts $742 $764
IA0214 #03 Y:1998 Install occupancy sensors $708 $1,264