| Assessment Year | 1999 |
|---|---|
| Principal Product | washing machine transmissions |
| NAICS |
n/a
|
| SIC | 3633: Household Laundry Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
75,000
ft2
|
| Annual Production | 950,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $131,980 | 5,129,250 |
kWh
|
$0.026 |
| Electricity Demand | $193,716 | 14,256 |
kW-mo/yr
|
$13.59 |
| Natural Gas | $35,638 | 8,070 |
MMBtu
|
$4.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $301,349 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $107,337 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,846 | $13,626 |
$4,163
162,075
kWh
|
$4,683
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,935 | $579 |
$1,460
56,858
kWh
|
$1,475
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $708 | $1,264 |
$708
27,550
kWh
|
- | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $742 | $764 |
$369
14,361
kWh
|
$373
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.4111: Use closed cycle process to minimize waste water production | $14,369 | $4,297 |
$(-144.0)
(-5,569)
kWh
|
$(-121.0)
-
kW-mo/yr
|
$17,134
-
Tgal
|
$(-2,500.0) | - | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $176,000 | $575,000 | - | - | - | $176,000 | - | |
| 07 | 3.1161: Eliminate/reduce an operation | $97,749 | $800 | - | - | - | $38,184 | $59,565 | |
| TOTAL RECOMMENDED | $301,349 | $596,330 |
$6,556
255,275
kWh
|
$6,410
-
kW-mo/yr
|
$17,134
-
Tgal
|
$211,684 | $59,565 | ||
| TOTAL IMPLEMENTED | $107,337 | $15,190 |
$4,532
176,436
kWh
|
$5,056
-
kW-mo/yr
|
- | $38,184 | $59,565 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs