ITAC Assessment: IA0214
ITAC logo
ITAC Assessment: IA0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product washing machine transmissions
NAICS
n/a
SIC 3633: Household Laundry Equipment
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 75,000
ft2
Annual Production 950,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,980 5,129,250
kWh
Electricity Demand $193,716 14,256
kW-mo/yr
Natural Gas $35,638 8,070
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $301,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,846 $13,626 $4,163
162,075
kWh
$4,683
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $2,935 $579 $1,460
56,858
kWh
$1,475
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $708 $1,264 $708
27,550
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $742 $764 $369
14,361
kWh
$373
-
kW-mo/yr
- - -
05 3.4111: Use closed cycle process to minimize waste water production $14,369 $4,297 $(-144.0)
(-5,569)
kWh
$(-121.0)
-
kW-mo/yr
$17,134
-
Tgal
$(-2,500.0) -
06 4.111: Add equipment/ operators to reduce production bottleneck $176,000 $575,000 - - - $176,000 -
07 3.1161: Eliminate/reduce an operation $97,749 $800 - - - $38,184 $59,565
TOTAL RECOMMENDED $301,349 $596,330 $6,556
255,275
kWh
$6,410
-
kW-mo/yr
$17,134
-
Tgal
$211,684 $59,565
TOTAL IMPLEMENTED $107,337 $15,190 $4,532
176,436
kWh
$5,056
-
kW-mo/yr
- $38,184 $59,565
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs