46
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Household refrigerators and home and farm freezers | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UD0712 #11 Y:2004 | 11 | 2004 | Turn off equipment during breaks, reduce operating time | $259 | $1,000 | |
UD0712 #10 Y:2004 | 10 | 2004 | Make a practice of turning off lights when not needed | $953 | - | |
UD0712 #09 Y:2004 | 09 | 2004 | Use / purchase optimum sized compressor | $1,498 | - | |
UD0712 #08 Y:2004 | 08 | 2004 | Turn off equipment during breaks, reduce operating time | $1,616 | $1,000 | |
UD0712 #07 Y:2004 | 07 | 2004 | Size electric motors for peak operating efficiency | $2,166 | $525 | |
UD0712 #06 Y:2004 | 06 | 2004 | Eliminate shift | $2,256 | - | |
UD0712 #05 Y:2004 | 05 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,839 | $839 | |
UD0712 #04 Y:2004 | 04 | 2004 | Use waste heat from hot flue gases to preheat | $6,955 | $20,660 | |
UD0712 #03 Y:2004 | 03 | 2004 | Change rate schedules or other changes in utility service | $8,212 | $22,500 | |
UD0712 #02 Y:2004 | 02 | 2004 | Upgrade controls on compressors | $8,635 | $1,000 | |
UD0712 #01 Y:2004 | 01 | 2004 | Utilize higher efficiency lamps and/or ballasts | $8,715 | $60 | |
UD0677 #13 Y:2003 | 13 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $143 | $400 | |
UD0677 #12 Y:2003 | 12 | 2003 | Add area lighting switches | $344 | $820 | |
UD0677 #11 Y:2003 | 11 | 2003 | Insulate bare equipment | $737 | $200 | |
UD0677 #10 Y:2003 | 10 | 2003 | Insulate bare equipment | $1,019 | $252 | |
UD0677 #09 Y:2003 | 09 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,135 | $400 | |
UD0677 #08 Y:2003 | 08 | 2003 | Install compressor air intakes in coolest locations | $1,700 | $470 | |
UD0677 #07 Y:2003 | 07 | 2003 | Disconnect ballasts | $3,557 | $297 | |
UD0677 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $15,580 | $53,130 | |
UD0677 #05 Y:2003 | 05 | 2003 | Replace city water with recycled water via cooling tower | $17,000 | $20,000 |