Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household refrigerators and home and farm freezers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0712 #11 Y:2004 Turn off equipment during breaks, reduce operating time $259 $1,000
UD0712 #10 Y:2004 Make a practice of turning off lights when not needed $953 -
UD0712 #09 Y:2004 Use / purchase optimum sized compressor $1,498 -
UD0712 #08 Y:2004 Turn off equipment during breaks, reduce operating time $1,616 $1,000
UD0712 #07 Y:2004 Size electric motors for peak operating efficiency $2,166 $525
UD0712 #06 Y:2004 Eliminate shift $2,256 -
UD0712 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,839 $839
UD0712 #04 Y:2004 Use waste heat from hot flue gases to preheat $6,955 $20,660
UD0712 #03 Y:2004 Change rate schedules or other changes in utility service $8,212 $22,500
UD0712 #02 Y:2004 Upgrade controls on compressors $8,635 $1,000
UD0712 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $8,715 $60
UD0677 #13 Y:2003 Utilize energy-efficient belts and other improved mechanisms $143 $400
UD0677 #12 Y:2003 Add area lighting switches $344 $820
UD0677 #11 Y:2003 Insulate bare equipment $737 $200
UD0677 #10 Y:2003 Insulate bare equipment $1,019 $252
UD0677 #09 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,135 $400
UD0677 #08 Y:2003 Install compressor air intakes in coolest locations $1,700 $470
UD0677 #07 Y:2003 Disconnect ballasts $3,557 $297
UD0677 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $15,580 $53,130
UD0677 #05 Y:2003 Replace city water with recycled water via cooling tower $17,000 $20,000