12
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| ME0261 #12 Y:1999 | 12 | 1999 | Not found | $29 | $27 | |
| ME0261 #11 Y:1999 | 11 | 1999 | Develop a repair/replace policy | $271 | $325 | |
| ME0261 #10 Y:1999 | 10 | 1999 | Minimize water usage | $788 | $500 | |
| ME0261 #09 Y:1999 | 09 | 1999 | Install compressor air intakes in coolest locations | $886 | $200 | |
| ME0261 #08 Y:1999 | 08 | 1999 | Insulate bare equipment | $1,053 | $1,200 | |
| ME0261 #07 Y:1999 | 07 | 1999 | Use cooling tower or economizer to replace chiller cooling | $4,394 | $3,080 | |
| ME0261 #06 Y:1999 | 06 | 1999 | Use or replace with energy efficient substitutes | $4,704 | $12,000 | |
| ME0261 #05 Y:1999 | 05 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $4,914 | $11,200 | |
| ME0261 #04 Y:1999 | 04 | 1999 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,134 | $900 | |
| ME0261 #03 Y:1999 | 03 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $9,477 | $7,909 | |
| ME0261 #02 Y:1999 | 02 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $10,535 | $25,000 | |
| ME0261 #01 Y:1999 | 01 | 1999 | Utilize higher efficiency lamps and/or ballasts | $18,284 | $80,602 |