matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| ND0305 #19 Y:1998 | 19 | 1998 | Reduce the pressure of compressed air to the minimum required | $67 | $20 | |
| ND0305 #18 Y:1998 | 18 | 1998 | Turn off equipment when not in use | $128 | $275 | |
| ND0305 #17 Y:1998 | 17 | 1998 | Increase amount of waste recovered for resale | $312 | $50 | |
| ND0305 #16 Y:1998 | 16 | 1998 | Lease / purchase baler; sell cardboard to recycler | $501 | $2,800 | |
| ND0305 #15 Y:1998 | 15 | 1998 | Upgrade obsolete equipment | $670 | $1,750 | |
| ND0305 #14 Y:1998 | 14 | 1998 | Utilize energy-efficient belts and other improved mechanisms | $1,100 | $1,180 | |
| ND0305 #13 Y:1998 | 13 | 1998 | Convert to aqueous cleaning system | $793 | $150 | |
| ND0305 #12 Y:1998 | 12 | 1998 | Recover waste heat from equipment | $1,101 | $5,400 | |
| ND0305 #11 Y:1998 | 11 | 1998 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,422 | $340 | |
| ND0305 #10 Y:1998 | 10 | 1998 | Use most efficient type of electric motors | $3,611 | $15,801 | |
| ND0305 #09 Y:1998 | 09 | 1998 | Optimize plant power factor | $5,272 | $1,250 | |
| ND0305 #08 Y:1998 | 08 | 1998 | Use closed cycle process to minimize waste water production | $3,722 | $10,000 | |
| ND0305 #07 Y:1998 | 07 | 1998 | Re-arrange equipment layout to reduce labor costs | $4,306 | $3,240 | |
| ND0305 #06 Y:1998 | 06 | 1998 | Use / purchase optimum sized compressor | $5,626 | $9,836 | |
| ND0305 #05 Y:1998 | 05 | 1998 | Utilize higher efficiency lamps and/or ballasts | $12,160 | $49,023 | |
| ND0305 #04 Y:1998 | 04 | 1998 | Initiate a total quality management program | $13,776 | $4,000 | |
| ND0305 #03 Y:1998 | 03 | 1998 | Replace existing equipment with more suitable substitutes | $40,120 | $85,000 | |
| ND0305 #02 Y:1998 | 02 | 1998 | Optimize plant power factor | $19,450 | $11,886 | |
| ND0305 #01 Y:1998 | 01 | 1998 | Insulate glazing, walls, ceilings, and roofs | $6,973 | $22,500 | |
| ND0296 #11 Y:1998 | 11 | 1998 | Re-arrange equipment layout to reduce labor costs | $2,080 | - |