Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Textile machinery
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0269 #13 Y:2014 Install occupancy sensors $51 $80
MI0269 #12 Y:2014 Increase amount of waste recovered for resale $140 $20
MI0269 #11 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $928 $1,660
MI0269 #10 Y:2014 Install timers on light switches in little used areas $1,064 $360
MI0269 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,598 $2,160
MI0269 #08 Y:2014 Lower light fixtures in high ceiling areas $2,668 $6,886
MI0269 #07 Y:2014 Install skylights $2,957 $500
MI0269 #06 Y:2014 Install partitions to reduce size of conditioned space $3,491 $9,600
MI0269 #05 Y:2014 Install vinyl strip / high speed / air curtain doors $3,528 $2,040
MI0269 #04 Y:2014 Turn off equipment when not in use $4,584 $3,600
MI0269 #03 Y:2014 Install partitions to reduce size of conditioned space $7,455 $22,478
MI0269 #02 Y:2014 Clean or color roof to reduce solar load $7,680 $15,839
MI0269 #01 Y:2014 Utilize a less expensive cooling method $33,693 $150,000
MI0123 #10 Y:2005 Turn off equipment when not in use $201 -
MI0123 #09 Y:2005 Convert to high volume low pressure (hvlp) paint guns $290 $24
MI0123 #08 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $403 $335
MI0123 #07 Y:2005 Make a practice of turning off lights when not needed $405 -
MI0123 #06 Y:2005 Install vinyl strip / high speed / air curtain doors $845 $660
MI0123 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,702 $1,018
MI0123 #04 Y:2005 Utilize controls to operate equipment only when needed $2,583 $140