Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cutting tools, machine tool accessories, and machinists' precision measuring devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0057 #06 Y:2024 Use photocell controls $381 $1,824
MU0057 #05 Y:2024 Turn off equipment when not in use $1,118 -
MU0057 #04 Y:2024 Use or replace with energy efficient substitutes $5,897 $4,100
MU0057 #03 Y:2024 Use or replace with energy efficient substitutes $12,535 $24,704
MU0057 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $596 -
MU0057 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $2,622 -
MU0050 #09 Y:2024 Install partitions to reduce size of conditioned space $540 $2,466
MU0050 #08 Y:2024 Close holes and openings in building such as broken windows $6,301 $10,644
MU0050 #07 Y:2024 Reduce space conditioning during non-working hours $1,230 -
MU0050 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,560 $2,073
MU0050 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $98 $320
MU0050 #04 Y:2024 Turn off equipment when not in use $20 $47
MU0050 #03 Y:2024 Use or replace with energy efficient substitutes $732 $435
MU0050 #02 Y:2024 Use or replace with energy efficient substitutes $45,726 $23,976
MU0050 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,159 $262
UU0227 #12 Y:2023 Use or replace with energy efficient substitutes $53 $333
UU0227 #11 Y:2023 Check for accuracy of utility / power meters $2,160 $2,000
UU0227 #10 Y:2023 Minimize water usage $2,457 $2,652
UU0227 #09 Y:2023 Reduce the pressure of compressed air to the minimum required $4,237 $6,000
UU0227 #08 Y:2023 Install occupancy sensors $4,289 $9,282