ITAC Assessment: UU0227
ITAC logo
ITAC Assessment: UU0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Drilling tools
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $100
M
to 500
M
# of Employees 246
Plant Area 70,000
ft2
Annual Production 650,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $396,965 4,995,440
kWh
Electricity Demand $166,928 10,771
kW-mo/yr
Natural Gas $50,864 4,119
MMBtu
Waste Disposal Costs
Water Usage $6,812 3,606
Tgal
Water Disposal $24,597 2,860
Tgal
TOTAL YEARLY COSTS $646,166
RECOMMENDED SAVINGS* $76,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,331

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Administrative Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $14,399 $40,790 $14,399
182,255
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,169 $10,776 $12,169
154,041
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,325 $78,840 $9,013
114,094
kWh
$2,312
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,103 $7,349 $9,695
122,721
kWh
$1,408
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,358 $13,337 $4,037
51,105
kWh
$1,321
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,776 $3,465 $3,764
47,647
kWh
$1,012
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,564 $7,061 $3,709
46,947
kWh
$856
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $4,289 $9,282 $4,289
54,288
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $4,237 $6,000 $3,101
39,250
kWh
$1,136
-
kW-mo/yr
- -
10 3.4151: Minimize water usage $2,457 $2,652 - - $2,457
-
Tgal
-
11 2.8118: Check for accuracy of utility / power meters $2,160 $2,000 - - - $2,160
12 2.4322: Use or replace with energy efficient substitutes $53 $333 $53
672
kWh
- - -
TOTAL RECOMMENDED $76,890 $181,885 $64,229
813,020
kWh
$8,044
-
kW-mo/yr
$2,457
-
Tgal
$2,160
TOTAL IMPLEMENTED $60,331 $139,095 $49,830
630,765
kWh
$8,044
-
kW-mo/yr
$2,457
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs