| Assessment Year | 2023 |
|---|---|
| Principal Product | Drilling tools |
| NAICS | 333131: Mining Machinery and Equipment Manufacturing |
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $100 M to 500M |
| # of Employees | 246 |
| Plant Area |
70,000
ft2
|
| Annual Production | 650,000
units
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $396,965 | 4,995,440 |
kWh
|
$0.079 | |
| Electricity Demand | $166,928 | 10,771 |
kW-mo/yr
|
$15.50 | |
| Natural Gas | $50,864 | 4,119 |
MMBtu
|
$12.35 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,812 | 3,606 |
Tgal
|
$1.89 | |
| Water Disposal | $24,597 | 2,860 |
Tgal
|
$8.60 | |
| TOTAL YEARLY COSTS | $646,166 | ||||
| RECOMMENDED SAVINGS* | $76,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $60,331 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $14,399 | $40,790 |
$14,399
182,255
kWh
|
- | - | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,169 | $10,776 |
$12,169
154,041
kWh
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,325 | $78,840 |
$9,013
114,094
kWh
|
$2,312
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,103 | $7,349 |
$9,695
122,721
kWh
|
$1,408
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,358 | $13,337 |
$4,037
51,105
kWh
|
$1,321
-
kW-mo/yr
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,776 | $3,465 |
$3,764
47,647
kWh
|
$1,012
-
kW-mo/yr
|
- | - | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,564 | $7,061 |
$3,709
46,947
kWh
|
$856
-
kW-mo/yr
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $4,289 | $9,282 |
$4,289
54,288
kWh
|
- | - | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,237 | $6,000 |
$3,101
39,250
kWh
|
$1,136
-
kW-mo/yr
|
- | - | |
| 10 | 3.4151: Minimize water usage | $2,457 | $2,652 | - | - |
$2,457
-
Tgal
|
- | |
| 11 | 2.8118: Check for accuracy of utility / power meters | $2,160 | $2,000 | - | - | - | $2,160 | |
| 12 | 2.4322: Use or replace with energy efficient substitutes | $53 | $333 |
$53
672
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $76,890 | $181,885 |
$64,229
813,020
kWh
|
$8,044
-
kW-mo/yr
|
$2,457
-
Tgal
|
$2,160 | ||
| TOTAL IMPLEMENTED | $60,331 | $139,095 |
$49,830
630,765
kWh
|
$8,044
-
kW-mo/yr
|
$2,457
-
Tgal
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs