Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cutting tools, machine tool accessories, and machinists' precision measuring devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0837 #13 Y:2011 Insulate glazing, walls, ceilings, and roofs $2,991 $11,835
UD0837 #12 Y:2011 Isolate hot or cold equipment $2,952 $11,720
UD0837 #11 Y:2011 Use waste heat from hot flue gases to preheat $10,692 $25,000
UD0837 #10 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $1,017 $500
UD0837 #09 Y:2011 Eliminate or reduce compressed air usage $538 $75
UD0837 #08 Y:2011 Eliminate or reduce compressed air usage $1,623 $1,200
UD0837 #07 Y:2011 Reduce the pressure of compressed air to the minimum required $2,735 $50
UD0837 #06 Y:2011 Utilize energy-efficient belts and other improved mechanisms $234 $25
UD0837 #05 Y:2011 Develop a repair/replace policy $1,689 $3,536
UD0837 #04 Y:2011 Utilize higher efficiency lamps and/or ballasts $382 $2,281
UD0837 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $1,500 $2,916
UD0837 #02 Y:2011 Utilize higher efficiency lamps and/or ballasts $5,869 $4,935
UD0837 #01 Y:2011 Utilize higher efficiency lamps and/or ballasts $6,572 $7,595
UD0340 #03 Y:1991 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,840 $5,000
UD0340 #02 Y:1991 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,513 -
UD0340 #01 Y:1991 Optimize plant power factor $5,952 $2,000
UD0293 #05 Y:1989 Recover waste heat from equipment $287 -
UD0293 #04 Y:1989 Reduce illumination to minimum necessary levels $498 $39
UD0293 #03 Y:1989 Recover waste heat from equipment $725 $1,000
UD0293 #02 Y:1989 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $776 -