19
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Machine tools, metal forming types | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0733 #11 Y:2005 | 11 | 2005 | Utilize higher efficiency lamps and/or ballasts | $512 | $2,200 | |
| UD0733 #10 Y:2005 | 10 | 2005 | Reduce the pressure of compressed air to the minimum required | $1,267 | - | |
| UD0733 #09 Y:2005 | 09 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,735 | - | |
| UD0733 #08 Y:2005 | 08 | 2005 | Contract a wood pallet recycling company | $2,035 | - | |
| UD0733 #07 Y:2005 | 07 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $2,883 | - | |
| UD0733 #06 Y:2005 | 06 | 2005 | Utilize daylight whenever possible in lieu of artificial light | $4,136 | - | |
| UD0733 #05 Y:2005 | 05 | 2005 | Upgrade controls on compressors | $5,125 | - | |
| UD0733 #04 Y:2005 | 04 | 2005 | Recover and reuse waste material | $8,505 | $5,000 | |
| UD0733 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $20,688 | $59,616 | |
| UD0733 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $32,973 | $29,659 | |
| UD0733 #01 Y:2005 | 01 | 2005 | Lower temperature during the winter season and vice-versa | $252,912 | $3,750 | |
| CO0564 #08 Y:2005 | 08 | 2005 | Utilize higher efficiency lamps and/or ballasts | $430 | $1,400 | |
| CO0564 #07 Y:2005 | 07 | 2005 | Install occupancy sensors | $610 | $2,380 | |
| CO0564 #06 Y:2005 | 06 | 2005 | Utilize higher efficiency lamps and/or ballasts | $870 | $3,510 | |
| CO0564 #05 Y:2005 | 05 | 2005 | Utilize higher efficiency lamps and/or ballasts | $2,090 | $8,320 | |
| CO0564 #04 Y:2005 | 04 | 2005 | Improve air circulation with destratification fans / other methods | $7,290 | $25,470 | |
| CO0564 #03 Y:2005 | 03 | 2005 | Use solar heat to heat make-up air | $11,250 | $72,910 | |
| CO0564 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $35,290 | $39,650 | |
| CO0564 #01 Y:2005 | 01 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,670 | $280 |