ITAC Assessment: CO0564
ITAC logo
ITAC Assessment: CO0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Can Press and Printing Machines
NAICS 333517: Machine Tool Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 93,360
ft2
Annual Production 10
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,007 1,762,400
kWh
Electricity Demand $53,926 4,106
kW-mo/yr
Electricity Fees $192 -
Natural Gas $30,216 3,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,670 $280 $1,060
30,100
kWh
$610
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,290 $39,650 $9,000
255,500
kWh
$6,480
-
kW-mo/yr
- $5,840 $13,970
03 2.9111: Use solar heat to heat make-up air $11,250 $72,910 - - $11,250
-
MMBtu
- -
04 2.7243: Improve air circulation with destratification fans / other methods $7,290 $25,470 $(-670.0)
(-19,000)
kWh
$(-340.0)
-
kW-mo/yr
$8,300
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,090 $8,320 $750
21,200
kWh
$1,140
-
kW-mo/yr
- $70 $130
06 2.7142: Utilize higher efficiency lamps and/or ballasts $870 $3,510 $450
12,900
kWh
$330
-
kW-mo/yr
- $(-20.0) $110
07 2.7135: Install occupancy sensors $610 $2,380 $530
14,900
kWh
- - $50 $30
08 2.7142: Utilize higher efficiency lamps and/or ballasts $430 $1,400 $40
1,000
kWh
$10
-
kW-mo/yr
- $120 $260
TOTAL RECOMMENDED $59,500 $153,920 $11,160
316,600
kWh
$8,230
-
kW-mo/yr
$19,550
-
MMBtu
$6,060 $14,500
TOTAL IMPLEMENTED $40,350 $53,160 $11,300
320,700
kWh
$8,570
-
kW-mo/yr
- $6,010 $14,470
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs