ITAC Assessment: UD0200
ITAC logo
ITAC Assessment: UD0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product GRAY & DUCTILE IRON CAST
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area
n/a
Annual Production 4,800,000
lb
Production Hrs. Annual 3,100
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,670 2,041,032
kWh
Natural Gas $72,329 8,519
MMBtu
Fuel Oil #2 $39,525 6,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,303 - $5,663
-
kWh
- $(-360.0)
02 2.4239: Eliminate or reduce compressed air usage $3,146 - $3,146
-
kWh
- -
03 2.2443: Re-use or recycle hot or cold process exhaust air $4,924 $3,000 - $4,924
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,613 $7,500 $5,148
75,322
kWh
$(-535.0)
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $11,014 $15,000 $(-4,905.0)
(-60,375)
kWh
$15,919
-
MMBtu
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $2,955 $1,500 - $2,955
-
MMBtu
-
TOTAL RECOMMENDED $31,955 $27,000 $9,052
14,947
kWh
$23,263
-
MMBtu
$(-360.0)
TOTAL IMPLEMENTED $20,941 $12,000 $13,957
75,322
kWh
$7,344
-
MMBtu
$(-360.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs