Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Liquid Foods
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 85,000
ft2
Annual Production 3,400,000
pieces
Production Hrs. Annual 5,700
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,778 2,119,800
kWh
Electricity Demand $97,388 6,143
kW-mo/yr
Natural Gas $68,215 7,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $10,513 $6,050 - - $10,513
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $4,661 $1,000 $4,661
81,809
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,730 $1,000 $1,248
21,900
kWh
$482
-
kW-mo/yr
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,140 $6,750 $1,654
29,025
kWh
$2,486
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $3,419 $7,066 $1,608
28,213
kWh
$1,811
-
kW-mo/yr
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $5,213 $12,000 $5,213
91,482
kWh
- -
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,199 $4,250 - - $2,199
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,084 $16,350 $6,789
119,144
kWh
$3,295
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $8,361 $14,795 $5,085
89,249
kWh
$3,276
-
kW-mo/yr
-
TOTAL RECOMMENDED $50,320 $69,261 $26,258
460,822
kWh
$11,350
-
kW-mo/yr
$12,712
-
MMBtu
TOTAL IMPLEMENTED $38,768 $46,261 $19,391
340,315
kWh
$8,864
-
kW-mo/yr
$10,513
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs