Assessment Year | 2009 |
---|---|
Principal Product | Liquid Foods |
NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
85,000
ft2
|
Annual Production | 3,400,000
pieces
|
Production Hrs. Annual | 5,700
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,778 | 2,119,800 |
kWh
|
$0.054 |
Electricity Demand | $97,388 | 6,143 |
kW-mo/yr
|
$15.85 |
Natural Gas | $68,215 | 7,770 |
MMBtu
|
$8.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,768 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $10,513 | $6,050 | - | - |
$10,513
-
MMBtu
|
|
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,661 | $1,000 |
$4,661
81,809
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,730 | $1,000 |
$1,248
21,900
kWh
|
$482
-
kW-mo/yr
|
- | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $4,140 | $6,750 |
$1,654
29,025
kWh
|
$2,486
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $3,419 | $7,066 |
$1,608
28,213
kWh
|
$1,811
-
kW-mo/yr
|
- | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,213 | $12,000 |
$5,213
91,482
kWh
|
- | - | |
07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,199 | $4,250 | - | - |
$2,199
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,084 | $16,350 |
$6,789
119,144
kWh
|
$3,295
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,361 | $14,795 |
$5,085
89,249
kWh
|
$3,276
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $50,320 | $69,261 |
$26,258
460,822
kWh
|
$11,350
-
kW-mo/yr
|
$12,712
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,768 | $46,261 |
$19,391
340,315
kWh
|
$8,864
-
kW-mo/yr
|
$10,513
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs