Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

328

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mining machinery and equipment, except oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0076 #06 Y:2016 Insulate bare equipment $655 $768
BS0076 #05 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $737 $871
BS0076 #04 Y:2016 Reduce space conditioning during non-working hours $962 $14
BS0076 #03 Y:2016 Utilize controls to operate equipment only when needed $1,367 $1,665
BS0076 #02 Y:2016 Upgrade controls on compressors $5,025 $2,777
BS0076 #01 Y:2016 Optimize plant power factor $14,626 $14,109
UK1601 #13 Y:2015 Utilize energy-efficient belts and other improved mechanisms $192 -
UK1601 #12 Y:2015 Turn off equipment when not in use $1,351 -
UK1601 #11 Y:2015 Install compressor air intakes in coolest locations $309 $710
UK1601 #10 Y:2015 Reduce the pressure of compressed air to the minimum required $315 -
UK1601 #09 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,047 $1,200
UK1601 #08 Y:2015 Utilize higher efficiency lamps and/or ballasts $495 $707
UK1601 #07 Y:2015 Install occupancy sensors $849 $175
UK1601 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $43,798 $34,110
UK1601 #05 Y:2015 Analyze flue gas for proper air/fuel ratio $1,706 $750
UK1601 #04 Y:2015 Use or replace with energy efficient substitutes $5,569 $3,000
UK1601 #03 Y:2015 Reduce space conditioning during non-working hours $1,523 -
UK1601 #02 Y:2015 Recycle air for heating, ventilation and air conditioning $19,178 $60,000
UK1601 #01 Y:2015 Optimize plant power factor $5,045 $7,350
NC0542 #13 Y:2015 Install occupancy sensors $1,213 $500