Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mining machinery and equipment, except oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0455 #11 Y:2014 Utilize higher efficiency lamps and/or ballasts $839 $725
BD0455 #09 Y:2014 Reduce the pressure of compressed air to the minimum required $2,388 $25
BD0455 #08 Y:2014 Install compressor air intakes in coolest locations $2,994 $900
BD0455 #06 Y:2014 Install occupancy sensors $6,580 $2,250
BD0455 #05 Y:2014 Recharge batteries on during off-peak demand periods $7,295 $25
BD0455 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $14,997 $40,950
BD0455 #02 Y:2014 Reduce the pressure of compressed air to the minimum required $19,322 $13,700
WI0271 #11 Y:1996 Install compressor air intakes in coolest locations $293 $640
WI0271 #10 Y:1996 Utilize higher efficiency lamps and/or ballasts $124 $60
WI0271 #09 Y:1996 Utilize higher efficiency lamps and/or ballasts $172 $85
WI0271 #08 Y:1996 Install occupancy sensors $280 $600
WI0271 #07 Y:1996 Install floating covers on tanks of volatile materials to reduce evaporation $873 -
WI0271 #01 Y:1996 Install equipment (eg compactor) to reduce disposal costs $8,700 -