Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

860

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0497 #06 Y:1998 Convert to high volume low pressure (hvlp) paint guns $78,000 $8,990
KU0497 #05 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $480 $450
KU0497 #04 Y:1998 Utilize higher efficiency lamps and/or ballasts $840 $1,050
KU0497 #03 Y:1998 Use optimum size and capacity equipment $3,080 -
KU0497 #02 Y:1998 Utilize higher efficiency lamps and/or ballasts $4,050 $7,880
KU0497 #01 Y:1998 Reposition oven walls to reduce heated space $5,550 $12,730
OK0534 #13 Y:1997 Contract a wood pallet recycling company $858 -
OK0534 #12 Y:1997 Insulate bare equipment $1,232 $1,004
OK0534 #11 Y:1997 Use counter-current rinsing to reduce rinse water volume (gravure) $2,350 $35,000
OK0534 #10 Y:1997 Insulate bare equipment $1,464 $485
OK0534 #09 Y:1997 Insulate bare equipment $3,414 $2,250
OK0534 #08 Y:1997 Recover waste heat from equipment $3,814 $732
OK0534 #07 Y:1997 Use counter-current rinsing to reduce rinse water volume (gravure) $5,196 $1,000
OK0534 #06 Y:1997 Use counter-current rinsing to reduce rinse water volume (gravure) $5,542 $27,375
OK0534 #05 Y:1997 Re-arrange equipment layout to reduce handling costs $6,240 $268,000
OK0534 #04 Y:1997 Replace electrically-operated equipment with fossil fuel equipment $9,484 $18,600
OK0534 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $7,249 $124,654
OK0534 #02 Y:1997 Utilize higher efficiency lamps and/or ballasts $128,530 $202,500
OK0534 #01 Y:1997 Use fossil fuel powered generator during peak demand periods $285,720 $575,000
ME0221 #07 Y:1997 Insulate bare equipment $315 $264