860
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Construction machinery and equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| KU0497 #06 Y:1998 | 06 | 1998 | Convert to high volume low pressure (hvlp) paint guns | $78,000 | $8,990 | |
| KU0497 #05 Y:1998 | 05 | 1998 | Eliminate leaks in inert gas and compressed air lines/ valves | $480 | $450 | |
| KU0497 #04 Y:1998 | 04 | 1998 | Utilize higher efficiency lamps and/or ballasts | $840 | $1,050 | |
| KU0497 #03 Y:1998 | 03 | 1998 | Use optimum size and capacity equipment | $3,080 | - | |
| KU0497 #02 Y:1998 | 02 | 1998 | Utilize higher efficiency lamps and/or ballasts | $4,050 | $7,880 | |
| KU0497 #01 Y:1998 | 01 | 1998 | Reposition oven walls to reduce heated space | $5,550 | $12,730 | |
| OK0534 #13 Y:1997 | 13 | 1997 | Contract a wood pallet recycling company | $858 | - | |
| OK0534 #12 Y:1997 | 12 | 1997 | Insulate bare equipment | $1,232 | $1,004 | |
| OK0534 #11 Y:1997 | 11 | 1997 | Use counter-current rinsing to reduce rinse water volume (gravure) | $2,350 | $35,000 | |
| OK0534 #10 Y:1997 | 10 | 1997 | Insulate bare equipment | $1,464 | $485 | |
| OK0534 #09 Y:1997 | 09 | 1997 | Insulate bare equipment | $3,414 | $2,250 | |
| OK0534 #08 Y:1997 | 08 | 1997 | Recover waste heat from equipment | $3,814 | $732 | |
| OK0534 #07 Y:1997 | 07 | 1997 | Use counter-current rinsing to reduce rinse water volume (gravure) | $5,196 | $1,000 | |
| OK0534 #06 Y:1997 | 06 | 1997 | Use counter-current rinsing to reduce rinse water volume (gravure) | $5,542 | $27,375 | |
| OK0534 #05 Y:1997 | 05 | 1997 | Re-arrange equipment layout to reduce handling costs | $6,240 | $268,000 | |
| OK0534 #04 Y:1997 | 04 | 1997 | Replace electrically-operated equipment with fossil fuel equipment | $9,484 | $18,600 | |
| OK0534 #03 Y:1997 | 03 | 1997 | Utilize higher efficiency lamps and/or ballasts | $7,249 | $124,654 | |
| OK0534 #02 Y:1997 | 02 | 1997 | Utilize higher efficiency lamps and/or ballasts | $128,530 | $202,500 | |
| OK0534 #01 Y:1997 | 01 | 1997 | Use fossil fuel powered generator during peak demand periods | $285,720 | $575,000 | |
| ME0221 #07 Y:1997 | 07 | 1997 | Insulate bare equipment | $315 | $264 | n/a |