ITAC Assessment: KU0497
ITAC logo
ITAC Assessment: KU0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product hydraulic cranes
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 63,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,724 928,488
kWh
Electricity Demand $16,362 2,649
kW-mo/yr
Natural Gas $46,233 9,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $146,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.5115: Reposition oven walls to reduce heated space $5,550 $12,730 $1,360
22,860
kWh
$510
-
kW-mo/yr
$3,680
-
MMBtu
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,050 $7,880 $2,410
40,152
kWh
$570
-
kW-mo/yr
- - $1,070 - -
03 2.4323: Use optimum size and capacity equipment $3,080 - $3,080
51,290
kWh
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $840 $1,050 $300
4,982
kWh
$40
-
kW-mo/yr
- - $500 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $480 $450 $380
6,448
kWh
$100
-
kW-mo/yr
- - - - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $78,000 $8,990 - - - - - $78,000 -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $7,300 $8,000 - - - $8,040
-
lb
$(-740.0) - -
08 3.8314: Purchase high materials in returnable bulk containers $1,220 $260 - - - - - $1,220 -
09 4.711: Initiate a total quality management program $46,350 $3,940 - - - - - - $46,350
TOTAL RECOMMENDED $146,870 $43,300 $7,530
125,732
kWh
$1,220
-
kW-mo/yr
$3,680
-
MMBtu
$8,040
-
lb
$830 $79,220 $46,350
TOTAL IMPLEMENTED $54,800 $13,320 $6,170
102,872
kWh
$710
-
kW-mo/yr
- - $1,570 - $46,350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs