2,891
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0244 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $22,838 | - | |
| WV0680 #11 Y:2025 | 11 | 2025 | Reduce the pressure of compressed air to the minimum required | $388 | $424 | |
| WV0680 #10 Y:2025 | 10 | 2025 | Eliminate or reduce compressed air usage | $1,146 | $1,082 | |
| WV0680 #09 Y:2025 | 09 | 2025 | Install compressor air intakes in coolest locations | $1,296 | $5,010 | |
| WV0680 #08 Y:2025 | 08 | 2025 | Utilize controls to operate equipment only when needed | $1,314 | $1,343 | |
| WV0680 #07 Y:2025 | 07 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,360 | $4,307 | |
| WV0680 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $1,628 | $5,289 | |
| WV0680 #05 Y:2025 | 05 | 2025 | Upgrade controls on compressors | $2,106 | $5,245 | |
| WV0680 #04 Y:2025 | 04 | 2025 | Use or replace with energy efficient substitutes | $9,835 | $33,120 | |
| WV0680 #03 Y:2025 | 03 | 2025 | Reduce ventilation air | $13,841 | $6,504 | |
| WV0680 #02 Y:2025 | 02 | 2025 | Insulate bare equipment | $19,535 | $2,495 | |
| WV0680 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $71,035 | $115,528 | |
| AM0945 #11 Y:2025 | 11 | 2025 | Use synthetic lubricant | $841 | - | |
| AM0945 #10 Y:2025 | 10 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,010 | $30 | |
| AM0945 #09 Y:2025 | 09 | 2025 | Remove or close off unneeded compressed air lines | $5,120 | $6,600 | |
| AM0945 #08 Y:2025 | 08 | 2025 | Replace existing hvac unit with high efficiency model | $22,560 | $681,000 | |
| AM0945 #07 Y:2025 | 07 | 2025 | Use cold waste water to cool chiller feed water | $26,500 | $2,650 | |
| AM0945 #06 Y:2025 | 06 | 2025 | Use or replace with energy efficient substitutes | $29,000 | $4,680 | |
| AM0945 #05 Y:2025 | 05 | 2025 | Optimize plant power factor | $30,475 | $47,407 | |
| AM0945 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $35,800 | $170,380 |