Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,902

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction, mining, and materials handling
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1000 #11 Y:2026 Reschedule plant operations or reduce load to avoid peaks $153,338 $140,400
AM1000 #10 Y:2026 Turn off equipment when not in use $21,976 $3,510
AM1000 #09 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $24,750 $9,608
AM1000 #08 Y:2026 Upgrade controls on compressors $27,675 $135
AM1000 #07 Y:2026 Upgrade obsolete equipment $37,485 $387,620
AM1000 #06 Y:2026 Reduce space conditioning during non-working hours $8,410 $1,080
AM1000 #05 Y:2026 Recover and reuse cooling water $11,972 $18,367
AM1000 #04 Y:2026 Meter recycled water (to reduce sewer charges) $21,796 $4,405
AM1000 #03 Y:2026 Optimize plant power factor $6,914 $11,898
AM1000 #02 Y:2026 Change rate schedules or other changes in utility service $73,849 $405
AM1000 #01 Y:2026 Apply for tax-free status for energy purchases $34,789 $17,500
OR0833 #05 Y:2026 Use solar heat to make electricty $70,518 $1,545,080
OR0833 #04 Y:2026 Replace existing equipment with more suitable substitutes $54,404 $244,570
OR0833 #03 Y:2026 Replace old machine with new automatic multi-station tool $149,890 $178,000
OR0833 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,254 $1,357
OR0833 #01 Y:2026 Eliminate or reduce compressed air usage $2,242 -
LS2605 #06 Y:2026 Replace fossil fuel equipment with electrical equipment $78,865 $433,647
LS2605 #05 Y:2026 Upgrade controls on compressors $2,498 $12,500
LS2605 #04 Y:2026 Install sub-metering equipment $6,258 $5,250
LS2605 #03 Y:2026 Clean and maintain refrigerant condensers and towers $1,247 $490