Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

269

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Internal combustion engines, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0467 #04 Y:2026 Optimize plant power factor $18,243 $121,000
MS0467 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $10,936 -
MS0467 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $5,879 $1,680
MS0467 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,030 $2,244
MS0466 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $19,101 $93,000
MS0466 #05 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $42,861 $712
MS0466 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,210 $2,244
MS0466 #03 Y:2026 Combine utility meters $300 -
MS0466 #02 Y:2026 Change rate schedules or other changes in utility service $44,517 -
MS0466 #01 Y:2026 Optimize plant power factor $41,807 $88,391
UA0303 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $7,587 $750
UA0303 #03 Y:2025 Use proper thickness of insulation on building envelope $68,468 $294,320
UA0303 #02 Y:2025 Replace existing hvac unit with high efficiency model $261,016 $1,003,778
UA0303 #01 Y:2025 Use solar heat to make electricty $521,373 $7,311,060
MZ0361 #09 Y:2024 Use solar heat to make electricty $322,316 $3,602,500
MZ0361 #08 Y:2024 Minimize water usage $71,580 $385,388
MZ0361 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $41,882 $33,744
MZ0361 #06 Y:2024 Re-size charging openings or add a movable door on equipment $45,827 $6,720
MZ0361 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $20,374 $117,036
MZ0361 #04 Y:2024 Install occupancy sensors $2,158 $1,750