Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,298

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial machinery and computer equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0992 #10 Y:2024 Replace existing chiller with high efficiency model $13,642 $39,500
GT0992 #09 Y:2024 Replace existing hvac unit with high efficiency model $58,314 $193,000
GT0992 #08 Y:2024 Turn off equipment during breaks, reduce operating time $271 $1,039
GT0992 #07 Y:2024 Use solar heat to make electricty $53,987 $203,336
GT0992 #06 Y:2024 Apply for tax-free status for energy purchases $350 $200
GT0992 #05 Y:2024 Pay utility bills on time $95 $50
GT0992 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $951 $400
GT0992 #03 Y:2024 Conserve energy by efficient use of vending machines $328 $135
GT0992 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $14,215 $1,850
GT0992 #01 Y:2024 Change rate schedules or other changes in utility service $2,701 $100
SU0565 #10 Y:2024 Use solar heat to make electricty $29,907 $383,075
SU0565 #09 Y:2024 Recover waste heat from equipment $1,298 $6,264
SU0565 #08 Y:2024 Use or replace with energy efficient substitutes $566 $906
SU0565 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,157 $7,850
SU0565 #06 Y:2024 Install an uninteruptable power supply $180,000 $160,000
SU0565 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,849 $329
SU0565 #04 Y:2024 Use or replace with energy efficient substitutes $965 $54
SU0565 #03 Y:2024 Eliminate or reduce compressed air usage $1,877 -
SU0565 #02 Y:2024 Apply for tax-free status for energy purchases $14,793 -
SU0565 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $6,336 -