15,727
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1129 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,317 | $953 |
n/a
|
| UD1129 #02 Y:2026 | 02 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $239 | - |
n/a
|
| UD1129 #01 Y:2026 | 01 | 2026 | Turn off equipment during breaks, reduce operating time | $16,412 | - |
n/a
|
| WM0257 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $648 | $5,434 |
n/a
|
| WM0257 #02 Y:2025 | 02 | 2025 | Install common header on compressors | $1,825 | $5,342 |
n/a
|
| WM0257 #01 Y:2025 | 01 | 2025 | Recharge batteries on during off-peak demand periods | $245 | - |
n/a
|
| MZ0392 #10 Y:2025 | 10 | 2025 | Reduce space conditioning during non-working hours | $19,865 | $1,400 |
n/a
|
| MZ0392 #09 Y:2025 | 09 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,700 | $1,000 |
n/a
|
| MZ0392 #08 Y:2025 | 08 | 2025 | Turn off equipment during breaks, reduce operating time | $602 | $530 |
n/a
|
| MZ0392 #07 Y:2025 | 07 | 2025 | Replace existing chiller with high efficiency model | $20,181 | $62,500 |
n/a
|
| MZ0392 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $89,166 | $755,622 |
n/a
|
| MZ0392 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $3,904 | $10,250 |
n/a
|
| MZ0392 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,559 | $500 |
n/a
|
| MZ0392 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $130 | $460 |
n/a
|
| MZ0392 #02 Y:2025 | 02 | 2025 | Utilize higher efficiency lamps and/or ballasts | $6,123 | $9,500 |
n/a
|
| MZ0392 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,718 | $9,190 |
n/a
|
| IP0218 #11 Y:2025 | 11 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $1,999 | $4,180 |
n/a
|
| IP0218 #10 Y:2025 | 10 | 2025 | Replace fossil fuel equipment with electrical equipment | $48,200 | $100,000 |
n/a
|
| IP0218 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $64,217 | $51,340 |
n/a
|
| IP0218 #08 Y:2025 | 08 | 2025 | Turn off equipment during breaks, reduce operating time | $4,427 | $2,340 |
n/a
|