Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,644

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial machinery and computer equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0588 #12 Y:2025 Use solar heat to make electricty $50,535 $467,049
SU0588 #11 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $377 $1,928
SU0588 #10 Y:2025 Install back-up equipment $30,784 $86,000
SU0588 #09 Y:2025 Install occupancy sensors $1,049 $2,285
SU0588 #08 Y:2025 Conserve energy by efficient use of vending machines $232 $368
SU0588 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,289 $1,441
SU0588 #06 Y:2025 Use or replace with energy efficient substitutes $422 $461
SU0588 #05 Y:2025 Install compressor air intakes in coolest locations $559 $471
SU0588 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $209
SU0588 #03 Y:2025 Use or replace with energy efficient substitutes $914 $74
SU0588 #02 Y:2025 Reduce space conditioning during non-working hours $775 -
SU0588 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,279 -
UU0288 #05 Y:2025 Eliminate or reduce compressed air usage $2,025 $6,732
UU0288 #04 Y:2025 Recover waste heat from equipment $832 $5,310
UU0288 #03 Y:2025 Recover waste heat from equipment $15,325 $47,180
UU0288 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $9,190 $15,750
UU0288 #01 Y:2025 Install an uninteruptable power supply $915,000 $1,225,000
OK1161 #04 Y:2025 Redesign process $57,400 $29,297
OK1161 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,661 $3,410
OK1161 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,351 $3,460