Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated metal products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0256 #05 Y:2018 Use compressor air filters $3,317 $7,200
MZ0256 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $6,589 -
BD0429 #01 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $12,975 $200
BD0273 #10 Y:2004 Utilize outside contracting $14,286 $200
BD0273 #09 Y:2004 Use plastic pallets instead of wood $22,476 $27,625
BD0273 #08 Y:2004 Reduce the pressure of compressed air to the minimum required $1,098 -
BD0273 #07 Y:2004 Recover waste heat from equipment $2,185 $2,900
BD0273 #06 Y:2004 Install occupancy sensors $2,608 $1,725
BD0273 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $4,942 $255
BD0273 #04 Y:2004 Use most efficient type of electric motors $5,606 $4,270
BD0273 #03 Y:2004 Install timers on light switches in little used areas $6,786 $3,000
BD0273 #02 Y:2004 Install wind powered electric generator $10,682 $50,000
BD0273 #01 Y:2004 Utilize higher efficiency lamps and/or ballasts $12,813 $3,470
BD0272 #17 Y:2004 Re-arrange equipment layout to reduce labor costs $59,000 $15,000
BD0272 #16 Y:2004 Utilize outside contracting $57,614 $200
BD0272 #15 Y:2004 Use plastic pallets instead of wood $11,370 $9,000
BD0272 #14 Y:2004 Use closed cycle process to minimize waste water production $14,414 $590
BD0272 #13 Y:2004 Contract a wood pallet recycling company $16,640 $140
BD0272 #12 Y:2004 Lease / purchase baler; sell cardboard to recycler $36,771 $7,140
BD0272 #11 Y:2004 Recover waste heat from equipment $448 $650