Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wire springs
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0575 #10 Y:2025 Use solar heat to make electricty $13,875 $178,227
SU0575 #09 Y:2025 Install vinyl strip / high speed / air curtain doors $144 $621
SU0575 #08 Y:2025 Conserve energy by efficient use of vending machines $98 $186
SU0575 #07 Y:2025 Install vinyl strip / high speed / air curtain doors $3,242 $4,739
SU0575 #06 Y:2025 Reduce space conditioning during non-working hours $769 $393
SU0575 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,017 $90
SU0575 #04 Y:2025 Use or replace with energy efficient substitutes $1,093 $37
SU0575 #03 Y:2025 Apply for tax-free status for energy purchases $4,602 $49
SU0575 #02 Y:2025 Eliminate or reduce compressed air usage $3,156 -
SU0575 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,632 -
SD0608 #06 Y:2021 Use most efficient type of electric motors $544 $1,695
SD0608 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,225 $143
SD0608 #04 Y:2021 Install vinyl strip / high speed / air curtain doors $3,201 $6,200
SD0608 #03 Y:2021 Insulate glazing, walls, ceilings, and roofs $3,270 $7,600
SD0608 #02 Y:2021 Replace existing hvac unit with high efficiency model $6,468 $18,900
SD0608 #01 Y:2021 Clean or color roof to reduce solar load $6,361 $152,000
UD0978 #09 Y:2017 Adjust burners for efficient operation $562 -
UD0978 #08 Y:2017 Cover open tanks $7,466 $5,000
UD0978 #07 Y:2017 Minimize non-essential material in heat treatment process $37,937 $100,000
UD0978 #06 Y:2017 Use optimum thickness insulation $86,982 $91,480