ITAC Assessment: UD0978
ITAC logo
ITAC Assessment: UD0978
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Automotive Coil Springs
NAICS 332613: Spring Manufacturing
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 100,000
ft2
Annual Production 19,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $659,275 8,139,200
kWh
Electricity Demand $15,215 1,790
kW-mo/yr
Electricity Fees $10,000 -
Natural Gas $369,380 94,640
MMBtu
Waste Disposal Costs
Water Usage $8,284 16,991
Tgal
Water Disposal $5,235 16,991
Tgal
TOTAL YEARLY COSTS $1,067,389
RECOMMENDED SAVINGS* $226,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $7,058 - $6,007
74,160
kWh
$1,051
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,107 $1,000 $3,107
38,363
kWh
- -
03 2.4235: Remove or close off unneeded compressed air lines $1,562 $1,000 $1,562
19,286
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $79,415 $79,850 $67,593
834,480
kWh
$11,822
-
kW-mo/yr
-
05 2.7131: Add area lighting switches $2,220 $180 $1,890
23,328
kWh
$330
-
kW-mo/yr
-
06 2.2515: Use optimum thickness insulation $86,982 $91,480 - - $86,982
-
MMBtu
07 2.2312: Minimize non-essential material in heat treatment process $37,937 $100,000 - - $37,937
-
MMBtu
08 2.2514: Cover open tanks $7,466 $5,000 - - $7,466
-
MMBtu
09 2.1133: Adjust burners for efficient operation $562 - - - $562
-
MMBtu
TOTAL RECOMMENDED $226,309 $278,510 $80,159
989,617
kWh
$13,203
-
kW-mo/yr
$132,947
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs