ITAC Assessment: SD0608
ITAC logo
ITAC Assessment: SD0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Formed Springs
NAICS 332613: Spring Manufacturing
SIC 3495: Wire Springs
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 45,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 3,183
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,305 891,015
kWh
Electricity Demand $99,954 4,547
kW-mo/yr
Electricity Fees $18,817 -
Waste Disposal Costs
Water Usage $9,171 12,830
Tgal
TOTAL YEARLY COSTS $211,247
RECOMMENDED SAVINGS* $21,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7425: Clean or color roof to reduce solar load $6,361 $152,000 $4,036
43,163
kWh
$2,325
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $6,468 $18,900 $3,362
35,952
kWh
$3,106
-
kW-mo/yr
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $3,270 $7,600 $3,270
34,976
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,201 $6,200 $1,873
20,027
kWh
$1,328
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,225 $143 $649
6,937
kWh
$576
-
kW-mo/yr
$0
06 2.4133: Use most efficient type of electric motors $544 $1,695 $289
3,089
kWh
$255
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,069 $186,538 $13,479
144,144
kWh
$7,590
-
kW-mo/yr
$0
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs