Assessment Year | 2021 |
---|---|
Principal Product | Metal Formed Springs |
NAICS | 332613: Spring Manufacturing |
SIC | 3495: Wire Springs |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
45,000
ft2
|
Annual Production | 5,000
units
|
Production Hrs. Annual | 3,183
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $83,305 | 891,015 |
kWh
|
$0.093 | |
Electricity Demand | $99,954 | 4,547 |
kW-mo/yr
|
$21.98 | |
Electricity Fees | $18,817 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $9,171 | 12,830 |
Tgal
|
$0.71 | |
TOTAL YEARLY COSTS | $211,247 | ||||
RECOMMENDED SAVINGS* | $21,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $6,361 | $152,000 |
$4,036
43,163
kWh
|
$2,325
-
kW-mo/yr
|
- | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $6,468 | $18,900 |
$3,362
35,952
kWh
|
$3,106
-
kW-mo/yr
|
- | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,270 | $7,600 |
$3,270
34,976
kWh
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,201 | $6,200 |
$1,873
20,027
kWh
|
$1,328
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,225 | $143 |
$649
6,937
kWh
|
$576
-
kW-mo/yr
|
$0 | |
06 | 2.4133: Use most efficient type of electric motors | $544 | $1,695 |
$289
3,089
kWh
|
$255
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $21,069 | $186,538 |
$13,479
144,144
kWh
|
$7,590
-
kW-mo/yr
|
$0 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs