Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0260 #09 Y:1999 Install back-up equipment $1,023,320 $184,320
MO0260 #08 Y:1999 Eliminate/reduce redundant inspections $6,630 $1,895
MO0260 #07 Y:1999 Reduce / eliminate use of disposable product $1,440 $1,440
MO0260 #06 Y:1999 Use synthetic lubricant $710 $174
MO0260 #05 Y:1999 Reduce the pressure of compressed air to the minimum required $2,545 $80
MO0260 #04 Y:1999 Install compressor air intakes in coolest locations $1,308 $205
MO0260 #03 Y:1999 Utilize energy-efficient belts and other improved mechanisms $1,591 -
MO0260 #02 Y:1999 Use most efficient type of electric motors $5,158 $6,558
MO0260 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $8,388 $10,745
MO0236 #08 Y:1998 Utilize other methods to remove contaminants $3,864 $10,000
MO0236 #07 Y:1998 Recover and reuse waste material $49,600 $15,000
MO0236 #06 Y:1998 Utilize energy-efficient belts and other improved mechanisms $206 -
MO0236 #05 Y:1998 Use most efficient type of electric motors $1,639 $2,805
MO0236 #04 Y:1998 Install compressor air intakes in coolest locations $930 $232
MO0236 #03 Y:1998 Utilize higher efficiency lamps and/or ballasts $1,270 $1,717
MO0236 #02 Y:1998 Change operating conditions $553 $380
MO0236 #01 Y:1998 Begin a practice of predictive / preventative maintenance $1,048 $2,700
MO0196 #08 Y:1997 Return spent solutions to the manufacturer $220 -
MO0196 #07 Y:1997 Use in-process recycling whenever possible $4,550 -
MO0196 #06 Y:1997 Install compressor air intakes in coolest locations $2,497 $197