Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,274

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0575 #10 Y:2025 Use solar heat to make electricty $13,875 $178,227
SU0575 #09 Y:2025 Install vinyl strip / high speed / air curtain doors $144 $621
SU0575 #08 Y:2025 Conserve energy by efficient use of vending machines $98 $186
SU0575 #07 Y:2025 Install vinyl strip / high speed / air curtain doors $3,242 $4,739
SU0575 #06 Y:2025 Reduce space conditioning during non-working hours $769 $393
SU0575 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,017 $90
SU0575 #04 Y:2025 Use or replace with energy efficient substitutes $1,093 $37
SU0575 #03 Y:2025 Apply for tax-free status for energy purchases $4,602 $49
SU0575 #02 Y:2025 Eliminate or reduce compressed air usage $3,156 -
SU0575 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,632 -
UC2511 #09 Y:2025 Replace fossil fuel equipment with electrical equipment $116,730 $360,000
UC2511 #08 Y:2025 Utilize controls to operate equipment only when needed $6,726 $75
UC2511 #07 Y:2025 Use solar heat to make electricty $225,469 $2,423,010
UC2511 #06 Y:2025 Insulate bare equipment $3,267 $2,180
UC2511 #05 Y:2025 Recover waste heat from equipment $22,999 $8,485
UC2511 #04 Y:2025 Use photocell controls $6,789 $14,000
UC2511 #03 Y:2025 Install occupancy sensors $6,520 $10,625
UC2511 #02 Y:2025 Install compressor air intakes in coolest locations $2,290 $2,200
UC2511 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,109 $1,474
MU0070 #14 Y:2025 Pay bills on time to avoid late fees $178 -