Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0083 #12 Y:2026 Pay bills on time to avoid late fees $1,478 -
MU0083 #11 Y:2026 Use proper thickness of insulation on building envelope $187 $556
MU0083 #10 Y:2026 Insulate glazing, walls, ceilings, and roofs $2,211 $4,353
MU0083 #09 Y:2026 Close holes and openings in building such as broken windows $56 $113
MU0083 #08 Y:2026 Install timers and/or thermostats $5,069 $1,095
MU0083 #07 Y:2026 Lower temperature during the winter season and vice-versa $14,336 -
MU0083 #06 Y:2026 Reschedule and rearrange multiple-source heating systems $4,945 -
MU0083 #05 Y:2026 Install occupancy sensors $233 $1,209
MU0083 #04 Y:2026 Eliminate or reduce compressed air usage $1,914 $1,793
MU0083 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $1,057 -
MU0083 #02 Y:2026 Reduce space conditioning during non-working hours $15,130 -
MU0083 #01 Y:2026 Recover heat from exhausted steam, hot air or hot water $23,488 $132,000
UD1127 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $482 $828
UD1127 #02 Y:2026 Reduce space conditioning during non-working hours $9,974 -
UD1127 #01 Y:2026 Reduce space conditioning during non-working hours $12,399 $3,735
UL2601 #07 Y:2026 Reschedule plant operations or reduce load to avoid peaks $6,800 -
UL2601 #06 Y:2026 Minimize operation of equipment maintained in standby condition $2,209 -
UL2601 #05 Y:2026 Install occupancy sensors $901 $1,397
UL2601 #04 Y:2026 Reduce illumination to minimum necessary levels $1,551 -
UL2601 #03 Y:2026 Use solar heat to make electricty $35,670 $476,148