Assessment Year | 1986 |
---|---|
Principal Product | CUSTOMIZED BERYLIUM COPPER |
NAICS |
n/a
|
SIC | 3495: Wire Springs |
Sales Range | $10 M to 50M |
# of Employees | 263 |
Plant Area |
n/a
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 6,675
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $356,018 | 5,025,205 |
kWh
|
$0.071 |
Natural Gas | $11,544 | 2,106 |
MMBtu
|
$5.48 |
Fuel Oil #4 | $40,365 | 7,484 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $111,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,844 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,729 | $90 |
$4,729
66,823
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $698 | $1,000 | - | - |
$698
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $807 | $537 | - | - |
$807
-
MMBtu
|
|
04 | 2.6121: Reduce hot water temperature to the minimum required | $1,017 | - |
$1,017
14,361
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,719 | $4,200 |
$2,541
35,756
kWh
|
$(-822.0)
-
MMBtu
|
- | |
06 | 2.7226: Use computer programs to optimize hvac performance | $20,785 | $36,000 |
$20,785
293,376
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,345 | $813 |
$4,345
61,254
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $463 | $486 |
$463
6,448
kWh
|
- | - | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,026 | $30,000 |
$28,171
397,714
kWh
|
$(-12,145.0)
-
MMBtu
|
- | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $60,934 | $175,000 |
$90,051
1,271,395
kWh
|
$(-29,117.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $111,523 | $248,126 |
$152,102
2,147,127
kWh
|
$(-42,084.0)
-
MMBtu
|
$1,505
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,844 | $38,926 |
$31,339
442,262
kWh
|
- |
$1,505
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs