Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coating, engraving, and allied services, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0489 #08 Y:2016 Install compressor air intakes in coolest locations $196 $400
BD0489 #07 Y:2016 Recover waste heat from equipment $270 $800
BD0489 #06 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $578 $400
BD0489 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $744 $411
BD0489 #04 Y:2016 Use most efficient type of electric motors $1,075 $1,320
BD0489 #03 Y:2016 Install occupancy sensors $1,418 $825
BD0489 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $5,863 $7,497
BD0489 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $14,215 $16,983
BD0266 #12 Y:2004 Use closed cycle process to minimize waste water production $1,404 $2,500
BD0266 #11 Y:2004 Replace existing equipment with more suitable substitutes $3,200 $96
BD0266 #10 Y:2004 Separate and recycle scrap metal to foundry or for sale $1,020 $96
BD0266 #09 Y:2004 Install floating covers on tanks of volatile materials to reduce evaporation $2,462 $1,575
BD0266 #08 Y:2004 Use most efficient type of electric motors $329 $510
BD0266 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $382 $323
BD0266 #06 Y:2004 Utilize energy-efficient belts and other improved mechanisms $504 $220
BD0266 #05 Y:2004 Install occupancy sensors $703 $1,425
BD0266 #04 Y:2004 Use most efficient type of electric motors $1,081 $2,765
BD0266 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $8,992 $600
BD0266 #02 Y:2004 Use less toxic and volatile solvent substitutes $6,225 $4,930
BD0266 #01 Y:2004 Burn a less expensive grade of fuel $260 $11,000