Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coating, engraving, and allied services, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1139 #06 Y:2026 Optimize plant power factor $7,031 $18,291
UD1139 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,899 $20,626
UD1139 #04 Y:2026 Re-use or recycle hot or cold process exhaust air $38,983 $15,000
UD1139 #03 Y:2026 Install compressor air intakes in coolest locations $3,681 $4,800
UD1139 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $4,391 -
UD1139 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,028 $1,000
SU0595 #10 Y:2026 Use closed cycle process to minimize waste water production $15,738 $185,000
SU0595 #09 Y:2026 Convert to indirect temperature control system $4,376 $43,750
SU0595 #08 Y:2026 Install desiccant humidity control system $786 $4,570
SU0595 #07 Y:2026 Recover waste heat from equipment $40 $208
SU0595 #06 Y:2026 Conserve energy by efficient use of vending machines $190 $568
SU0595 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $502 $105
SU0595 #04 Y:2026 Use or replace with energy efficient substitutes $1,372 $119
SU0595 #03 Y:2026 Apply for tax-free status for energy purchases $8,965 $65
SU0595 #02 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,928 -
SU0595 #01 Y:2026 Eliminate or reduce compressed air usage $339 -
TT0353 #11 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $666 $1,520
TT0353 #10 Y:2026 Upgrade controls on compressors $2,152 $5,000
TT0353 #09 Y:2026 Use waste heat from hot flue gases to preheat $28,283 $60,000
TT0353 #08 Y:2026 Optimize plant power factor $3,128 $9,435