Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,097

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coating, engraving, and allied services, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0587 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $735 $2,997
LE0587 #06 Y:2024 Preheat combustion air with waste heat $4,080 $15,000
LE0587 #05 Y:2024 Replace existing hvac unit with high efficiency model $1,851 $6,801
LE0587 #04 Y:2024 Install compressor air intakes in coolest locations $667 $2,000
LE0587 #03 Y:2024 Use solar heat to make electricty $58,495 $104,135
LE0587 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $10,795 $1,400
LE0587 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $2,438 -
UU0263 #12 Y:2024 Replace fossil fuel equipment with electrical equipment $32,910 $158,576
UU0263 #11 Y:2024 Apply for tax-free status for energy purchases $8,090 $5,000
UU0263 #10 Y:2024 Pay utility bills on time $1,860 $1,500
UU0263 #09 Y:2024 Optimize plant power factor $3,940 $9,000
UU0263 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $945 $3,580
UU0263 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $5,270 $7,380
UU0263 #06 Y:2024 Purchase gas directly from a contract gas supplier $4,840 $11,200
UU0263 #05 Y:2024 Repair faulty insulation in furnaces, boilers, etc $3,948 $2,110
UU0263 #04 Y:2024 Use waste heat from hot flue gases to preheat $1,805 $8,150
UU0263 #03 Y:2024 Use proper thickness of insulation on building envelope $1,365 $1,730
UU0263 #02 Y:2024 Improve air circulation with destratification fans / other methods $7,105 $5,100
UU0263 #01 Y:2024 Install common header on compressors $7,583 $46,630
IC0317 #13 Y:2024 Insulate bare equipment $2,154 $4,516