Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

666

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive stampings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0300 #09 Y:2025 Change rate schedules or other changes in utility service $68,972 $800
UA0300 #08 Y:2025 Use solar heat to make electricty $1,068,159 $16,699,440
UA0300 #07 Y:2025 Utilize energy-efficient belts and other improved mechanisms $39,620 $5,802
UA0300 #06 Y:2025 Keep doors and windows shut when not on use $17,760 $3,128
UA0300 #05 Y:2025 Install timers and/or thermostats $10,419 $395
UA0300 #04 Y:2025 Improve air circulation with destratification fans / other methods $2,516 $17,050
UA0300 #03 Y:2025 Replace existing hvac unit with high efficiency model $264,212 $1,445,408
UA0300 #02 Y:2025 Install outside air damper / economizer on hvac unit $135,884 $7,000
UA0300 #01 Y:2025 Use proper thickness of insulation on building envelope $325,791 $656,120
UA0299 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,647 $7,759
UA0299 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,885 $2,349
UA0299 #05 Y:2025 Turn off equipment when not in use $7,332 $4,020
UA0299 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,103 $10,944
UA0299 #03 Y:2025 Install timers and/or thermostats $10,720 $241
UA0299 #02 Y:2025 Keep doors and windows shut when not on use $13,247 $2,208
UA0299 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,742 $32,193
TT0329 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $566 $600
TT0329 #07 Y:2025 Turn off equipment during breaks, reduce operating time $1,666 $2,490
TT0329 #06 Y:2025 Upgrade controls on compressors $1,983 $500
TT0329 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,210 $275