Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

859

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal doors, sash, frames, molding, and trim manufacturing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2408 #10 Y:2024 Change rate schedules or other changes in utility service $17,102 $30,000
UC2408 #09 Y:2024 Replace existing hvac unit with high efficiency model $33,101 $341,537
UC2408 #08 Y:2024 Use battery storage for demand control $6,458 $61,975
UC2408 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,445 $1,300
UC2408 #06 Y:2024 Utilize controls to operate equipment only when needed $6,293 $60
UC2408 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,973 $75
UC2408 #04 Y:2024 Install timers and/or thermostats $5,106 $816
UC2408 #03 Y:2024 Use solar heat to make electricty $71,178 $259,330
UC2408 #02 Y:2024 Apply for tax-free status for energy purchases $4,304 -
UC2408 #01 Y:2024 Pay utility bills on time $187 -
MI0431 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $816 $1,400
MI0431 #06 Y:2023 Eliminate or reduce compressed air usage $5,030 $80
MI0431 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,269 $1,020
MI0431 #04 Y:2023 Install occupancy sensors $8,323 $680
MI0431 #03 Y:2023 Optimize plant power factor $8,963 $16,003
MI0431 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $10,760 $11,272
MI0431 #01 Y:2023 Utilize a less expensive cooling method $11,840 $55,500
NL0070 #08 Y:2022 Utilize higher efficiency lamps and/or ballasts $490 $854
NL0070 #07 Y:2022 Utilize energy-efficient belts and other improved mechanisms $675 $3,315
NL0070 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,590 $23,500