16
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Fabricated structural metal | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TN0603 #09 Y:1996 | 09 | 1996 | Utilize higher efficiency lamps and/or ballasts | $120 | $150 | |
TN0603 #08 Y:1996 | 08 | 1996 | Use a rag recycle service | $455 | - | |
TN0603 #07 Y:1996 | 07 | 1996 | Install timers and/or thermostats | $840 | $140 | |
TN0603 #06 Y:1996 | 06 | 1996 | Convert to air assisted / airless paint guns | $8,550 | $13,100 | |
TN0603 #05 Y:1996 | 05 | 1996 | Use radiant heater for spot heating | $16,800 | $19,100 | |
TN0603 #04 Y:1996 | 04 | 1996 | Use automatic cleaning equipment | $18,020 | $38,470 | |
TN0603 #03 Y:1996 | 03 | 1996 | Separate and recycle scrap metal to foundry or for sale | $30,580 | - | |
TN0603 #02 Y:1996 | 02 | 1996 | Add equipment/ operators to reduce production bottleneck | $31,200 | $21,000 | |
TN0603 #01 Y:1996 | 01 | 1996 | Eliminate old stock and modify inventory control | $31,860 | $12,660 | |
TN0225 #07 Y:1984 | 07 | 1984 | Replace electrically-operated equipment with fossil fuel equipment | $1,159 | $3,500 | |
TN0225 #06 Y:1984 | 06 | 1984 | Lower temperature during the winter season and vice-versa | $1,056 | - | |
TN0225 #05 Y:1984 | 05 | 1984 | Install adequate dryers on air lines to eliminate blowdown | $18,012 | $10,000 | |
TN0225 #04 Y:1984 | 04 | 1984 | Install vinyl strip / high speed / air curtain doors | $1,236 | $500 | |
TN0225 #03 Y:1984 | 03 | 1984 | Utilize daylight whenever possible in lieu of artificial light | $6,670 | - | |
TN0225 #02 Y:1984 | 02 | 1984 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,768 | $95 | |
TN0225 #01 Y:1984 | 01 | 1984 | Replace fossil fuel equipment with electrical equipment | $5,090 | $13,000 |