Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0435 #05 Y:2013 Install occupancy sensors $287 $250
BD0435 #04 Y:2013 Use radiant heater for spot heating $618 $2,100
BD0435 #03 Y:2013 Utilize higher efficiency lamps and/or ballasts $654 $730
BD0435 #02 Y:2013 Use photocell controls $1,708 $500
BD0435 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,612 $12,980
BD0371 #09 Y:2010 Utilize higher efficiency lamps and/or ballasts $383 $300
BD0371 #08 Y:2010 Install compressor air intakes in coolest locations $826 $1,200
BD0371 #07 Y:2010 Use synthetic lubricant $1,752 $900
BD0371 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,199 $8,511
BD0371 #05 Y:2010 Use most efficient type of electric motors $5,027 $10,100
BD0371 #04 Y:2010 Reduce the pressure of compressed air to the minimum required $5,181 $10
BD0371 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $5,855 $4,900
BD0371 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $17,099 $59,000
BD0371 #01 Y:2010 Use radiant heater for spot heating $18,738 $7,700
BD0186 #10 Y:2001 Lease / purchase baler; sell cardboard to recycler $106 $300
BD0186 #09 Y:2001 Minimize water usage $264 $690
BD0186 #08 Y:2001 Use closed cycle process to minimize waste water production $4,364 $10,000
BD0186 #07 Y:2001 Use most efficient type of electric motors $188 $480
BD0186 #06 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $205 $700
BD0186 #05 Y:2001 Install occupancy sensors $448 $1,125