ITAC Assessment: TN0603
ITAC logo
ITAC Assessment: TN0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steel structural members
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 71
Plant Area 100,000
ft2
Annual Production 3,200
ton
Production Hrs. Annual 5,304
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,269 966,295
kWh
Electricity Demand $27,497 3,888
kW-mo/yr
Electricity Fees $5,227 -
Natural Gas $627 71
MMBtu
LPG $33,606 4,389
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
01 4.322: Eliminate old stock and modify inventory control $31,860 $12,660 - - - - - $(-9,360.0) $(-3,120.0) $44,340 - -
02 4.111: Add equipment/ operators to reduce production bottleneck $31,200 $21,000 - - - - - $(-60,000.0) - - - $91,200
03 3.5248: Separate and recycle scrap metal to foundry or for sale $30,580 - - - - - $30,580
-
lb
- - - - -
04 3.2172: Use automatic cleaning equipment $18,020 $38,470 $1,480
49,238
kWh
- - - - $11,700 - - $4,840 -
05 2.7231: Use radiant heater for spot heating $16,800 $19,100 - - - $16,800
-
MMBtu
- - - - - -
06 3.2124: Convert to air assisted / airless paint guns $8,550 $13,100 - - - - - - - - $8,550 -
07 2.7261: Install timers and/or thermostats $840 $140 $480
16,120
kWh
- $360
-
MMBtu
- - - - - - -
08 3.7131: Use a rag recycle service $455 - - - - - $530
-
lb
- - - $(-75.0) -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $120 $150 $10
293
kWh
$110
-
kW-mo/yr
- - - - - - - -
TOTAL RECOMMENDED $138,425 $104,620 $1,970
65,651
kWh
$110
-
kW-mo/yr
$360
-
MMBtu
$16,800
-
MMBtu
$31,110
-
lb
$(-57,660.0) $(-3,120.0) $44,340 $13,315 $91,200
TOTAL IMPLEMENTED $63,635 $33,810 $10
293
kWh
$110
-
kW-mo/yr
- - $530
-
lb
$(-69,360.0) $(-3,120.0) $44,340 $(-75.0) $91,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs