Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,770

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0295 #08 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $15,103 $291,632
UU0295 #07 Y:2026 Upgrade obsolete equipment $29,987 $230,300
UU0295 #06 Y:2026 Replace old machine with new automatic multi-station tool $67,000 $366,000
UU0295 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,215 $2,600
UU0295 #04 Y:2026 Add equipment/ operators to reduce production bottleneck $117,621 $572,000
UU0295 #03 Y:2026 Increase use of automation $104,580 $436,000
UU0295 #02 Y:2026 Increase use of automation $108,218 $717,000
UU0295 #01 Y:2026 Increase use of automation $108,218 $1,740,000
UC2518 #06 Y:2025 Eliminate or reduce compressed air usage $336 $966
UC2518 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $22,153 -
UC2518 #04 Y:2025 Install compressor air intakes in coolest locations $5,929 $1,140
UC2518 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,741 $822
UC2518 #02 Y:2025 Pay utility bills on time $3,302 -
UC2518 #01 Y:2025 Apply for tax-free status for energy purchases $4,987 -
GT1001 #10 Y:2025 Use solar heat to make electricty $64,801 $290,462
GT1001 #09 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $3,355 $8,200
GT1001 #08 Y:2025 Turn off equipment during breaks, reduce operating time $515 $680
GT1001 #07 Y:2025 Install vinyl strip / high speed / air curtain doors $7,162 $8,061
GT1001 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,778 $2,389
GT1001 #05 Y:2025 Insulate bare equipment $2,548 $640