Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,912

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0143 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $891 $500
NL0143 #06 Y:2026 Install vinyl strip / high speed / air curtain doors $8,763 $9,469
NL0143 #05 Y:2026 Use proper thickness of insulation on building envelope $19,548 $85,770
NL0143 #04 Y:2026 Use proper thickness of insulation on building envelope $38,419 $169,049
NL0143 #03 Y:2026 Consider use / purchase of bulk materials where possible $90,400 $300,708
NL0143 #02 Y:2026 Install adequate dryers on air lines to eliminate blowdown $104,880 $43,894
NL0143 #01 Y:2026 Upgrade obsolete equipment $431,484 $274,750
IP0224 #04 Y:2026 Install occupancy sensors $449 $929
IP0224 #03 Y:2026 Upgrade controls on compressors $953 $1,752
IP0224 #02 Y:2026 Recover waste heat from equipment $4,828 $3,830
IP0224 #01 Y:2026 Install compressor air intakes in coolest locations $3,464 $731
GT1014 #06 Y:2026 Use solar heat to make electricty $178,027 $1,244,837
GT1014 #05 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $241,109 $1,035,000
GT1014 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $8,377 $24,000
GT1014 #03 Y:2026 Conserve energy by efficient use of vending machines $158 $180
GT1014 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,184 $100
GT1014 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $23,097 $1,850
OK1175 #05 Y:2026 Conserve energy by efficient use of vending machines $168 $248
OK1175 #04 Y:2026 Clean and maintain refrigerant condensers and towers $530 $964
OK1175 #03 Y:2026 Use computer programs to optimize hvac performance $3,749 $19,250