Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,783

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated structural metal products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0061 #07 Y:2026 Utilize controls to operate equipment only when needed $2,345 $4,000
NT0061 #06 Y:2026 Optimize plant power factor $26,908 $18,471
NT0061 #05 Y:2026 Replace existing hvac unit with high efficiency model $64,273 $36,400
NT0061 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $6,221 -
NT0061 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,162 $5,609
NT0061 #02 Y:2026 Use or replace with energy efficient substitutes $142,635 $71,624
NT0061 #01 Y:2026 Use / purchase optimum sized compressor $150,000 $35,400
WM0259 #05 Y:2026 Install spectral reflectors / delamp $265 -
WM0259 #04 Y:2026 Install adequate dryers on air lines to eliminate blowdown $1,514 $1,508
WM0259 #03 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $24,491 $20,000
WM0259 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $46,427 $10,000
WM0259 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $134,432 -
LT8442 #04 Y:2026 Turn off equipment when not in use $3,161 $918
LT8442 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $474 $132
LT8442 #02 Y:2026 Install shelves / racks to utilize unused space $66,000 $32,760
LT8442 #01 Y:2026 Modify workload $6,666 $9,600
UU0295 #07 Y:2026 Upgrade obsolete equipment $29,987 $230,300
UU0295 #06 Y:2026 Replace old machine with new automatic multi-station tool $67,000 $366,000
UU0295 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,215 $2,600
UU0295 #04 Y:2026 Add equipment/ operators to reduce production bottleneck $117,621 $572,000