5,813
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0647 #12 Y:2026 | 12 | 2026 | Re-arrange equipment layout to reduce labor costs | $5,628 | $1,368 |
n/a
|
| UF0647 #11 Y:2026 | 11 | 2026 | Optimize production lot sizes and inventories | $22,000 | $4,000 |
n/a
|
| UF0647 #10 Y:2026 | 10 | 2026 | Install sensors to detect defects | $50,000 | $85,000 |
n/a
|
| UF0647 #09 Y:2026 | 09 | 2026 | Automate finishing process | $242,080 | $200,000 |
n/a
|
| UF0647 #08 Y:2026 | 08 | 2026 | Substitute compressed air cooling with water or air cooling | $369 | $900 |
n/a
|
| UF0647 #07 Y:2026 | 07 | 2026 | Size electric motors for peak operating efficiency | $377 | - |
n/a
|
| UF0647 #06 Y:2026 | 06 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $442 | - |
n/a
|
| UF0647 #05 Y:2026 | 05 | 2026 | Minimize condenser cooling water temperature | $1,056 | $2,800 |
n/a
|
| UF0647 #04 Y:2026 | 04 | 2026 | Isolate hot or cold equipment | $7,455 | $28,000 |
n/a
|
| UF0647 #03 Y:2026 | 03 | 2026 | Utilize sensors controlling roof and wall openings | $8,168 | $4,000 |
n/a
|
| UF0647 #02 Y:2026 | 02 | 2026 | Use demand controller or load shedder | $19,310 | $12,418 |
n/a
|
| UF0647 #01 Y:2026 | 01 | 2026 | Use or replace with energy efficient substitutes | $75,479 | $250,000 |
n/a
|
| UD1133 #09 Y:2026 | 09 | 2026 | Install occupancy sensors | $205 | $218 |
n/a
|
| UD1133 #08 Y:2026 | 08 | 2026 | Use hot process fluids to preheat incoming process fluids | $7,222 | $2,552 |
n/a
|
| UD1133 #07 Y:2026 | 07 | 2026 | Turn off equipment during breaks, reduce operating time | $9,566 | - |
n/a
|
| UD1133 #06 Y:2026 | 06 | 2026 | Install motor voltage controller on lightly loaded motors | $15,204 | $8,166 |
n/a
|
| UD1133 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $18,109 | $953 |
n/a
|
| UD1133 #04 Y:2026 | 04 | 2026 | Install compressor air intakes in coolest locations | $23,389 | $4,800 |
n/a
|
| UD1133 #03 Y:2026 | 03 | 2026 | Recover mechanical energy | $53,790 | $13,165 |
n/a
|
| UD1133 #02 Y:2026 | 02 | 2026 | Install vinyl strip / high speed / air curtain doors | $4,175 | $1,260 |
n/a
|