Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

271

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plumbing fixture fittings and trim
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0305 #12 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,840 $2,566
IC0305 #11 Y:2024 Install compressor air intakes in coolest locations $271 $1,572
IC0305 #10 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,048 $5,899
IC0305 #09 Y:2024 Install occupancy sensors $677 -
IC0305 #08 Y:2024 Lower temperature during the winter season and vice-versa $241 -
IC0305 #07 Y:2024 Insulate bare equipment $1,737 $2,801
IC0305 #06 Y:2024 Recharge batteries on during off-peak demand periods $2,506 -
IC0305 #05 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $1,126 $3,467
IC0305 #04 Y:2024 Use solar heat to make electricty $24,798 $190,030
IC0305 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,071 $5,184
IC0305 #02 Y:2024 Eliminate or reduce compressed air usage $28,145 $2,500
IC0305 #01 Y:2024 Increase amount of condensate returned $8,515 $18,062
UA0283 #11 Y:2023 Use waste heat from hot flue gases to preheat $4,688 $31,108
UA0283 #10 Y:2023 Use synthetic lubricant $6,907 $21,930
UA0283 #09 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,911 $8,591
UA0283 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $8,686 $750
UA0283 #07 Y:2023 Install timers and/or thermostats $14,473 $2,726
UA0283 #06 Y:2023 Meter recycled water (to reduce sewer charges) $12,662 $6,036
UA0283 #05 Y:2023 Pay bills on time to avoid late fees $21,298 -
UA0283 #04 Y:2023 Reduce illumination to minimum necessary levels $4,087 -