ITAC Assessment: IC0305
ITAC logo
ITAC Assessment: IC0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Laboratory Equipment
NAICS 332913: Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 171
Plant Area 120,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,485
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,175 2,276,265
kWh
Electricity Demand $67,019 7,642
kW-mo/yr
Electricity Fees $54,493 -
Natural Gas $50,336 13,532
MMBtu
Waste Disposal Costs
Water Usage $24,713 5,147
Tgal
Water Disposal $24,713 5,147
Tgal
Other Liquid (non-haz) $14,008 1
gal
TOTAL YEARLY COSTS $317,458
RECOMMENDED SAVINGS* $76,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2121: Increase amount of condensate returned $8,515 $18,062 $(-61.8)
(-1,717)
kWh
$(-38.2)
-
kW-mo/yr
$5,616 $2,999
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $28,145 $2,500 $4,529
125,799
kWh
$23,616
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,071 $5,184 $1,299
36,077
kWh
$772
-
kW-mo/yr
- -
04 2.9114: Use solar heat to make electricty $24,798 $190,030 $10,064
279,559
kWh
$14,734
-
kW-mo/yr
- -
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,126 $3,467 - - - $1,126
-
MMBtu
06 2.3132: Recharge batteries on during off-peak demand periods $2,506 - - $2,506
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $1,737 $2,801 - - - $1,737
-
MMBtu
08 2.7221: Lower temperature during the winter season and vice-versa $241 - $146
4,056
kWh
$95
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $677 - $233
6,480
kWh
$443
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,048 $5,899 $1,240
34,444
kWh
$808
-
kW-mo/yr
- -
11 2.4221: Install compressor air intakes in coolest locations $271 $1,572 $164
4,556
kWh
$107
-
kW-mo/yr
- -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,840 $2,566 $2,989
83,031
kWh
$1,850
-
kW-mo/yr
- -
TOTAL RECOMMENDED $76,974 $232,081 $20,602
572,284
kWh
$44,893
-
kW-mo/yr
$5,616 $5,862
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs