Assessment Year | 2024 |
---|---|
Principal Product | Laboratory Equipment |
NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 171 |
Plant Area |
120,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 4,485
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $82,175 | 2,276,265 |
kWh
|
$0.036 | |
Electricity Demand | $67,019 | 7,642 |
kW-mo/yr
|
$8.77 | |
Electricity Fees | $54,493 | - |
|
- | |
Natural Gas | $50,336 | 13,532 |
MMBtu
|
$3.72 | |
Waste Disposal Costs | |||||
Water Usage | $24,713 | 5,147 |
Tgal
|
$4.80 | |
Water Disposal | $24,713 | 5,147 |
Tgal
|
$4.80 | |
Other Liquid (non-haz) | $14,008 | 1 |
gal
|
$14,008.38 | |
TOTAL YEARLY COSTS | $317,458 | ||||
RECOMMENDED SAVINGS* | $76,974 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $8,515 | $18,062 |
$(-61.8)
(-1,717)
kWh
|
$(-38.2)
-
kW-mo/yr
|
$5,616 |
$2,999
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $28,145 | $2,500 |
$4,529
125,799
kWh
|
$23,616
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,071 | $5,184 |
$1,299
36,077
kWh
|
$772
-
kW-mo/yr
|
- | - | |
04 | 2.9114: Use solar heat to make electricty | $24,798 | $190,030 |
$10,064
279,559
kWh
|
$14,734
-
kW-mo/yr
|
- | - | |
05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $1,126 | $3,467 | - | - | - |
$1,126
-
MMBtu
|
|
06 | 2.3132: Recharge batteries on during off-peak demand periods | $2,506 | - | - |
$2,506
-
kW-mo/yr
|
- | - | |
07 | 2.2511: Insulate bare equipment | $1,737 | $2,801 | - | - | - |
$1,737
-
MMBtu
|
|
08 | 2.7221: Lower temperature during the winter season and vice-versa | $241 | - |
$146
4,056
kWh
|
$95
-
kW-mo/yr
|
- | - | |
09 | 2.7135: Install occupancy sensors | $677 | - |
$233
6,480
kWh
|
$443
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,048 | $5,899 |
$1,240
34,444
kWh
|
$808
-
kW-mo/yr
|
- | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $271 | $1,572 |
$164
4,556
kWh
|
$107
-
kW-mo/yr
|
- | - | |
12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,840 | $2,566 |
$2,989
83,031
kWh
|
$1,850
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $76,974 | $232,081 |
$20,602
572,284
kWh
|
$44,893
-
kW-mo/yr
|
$5,616 |
$5,862
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs