Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Enameled iron and metal sanitary ware
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0116 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,073 $12,258
TT0116 #03 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,077 $700
TT0116 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $837 $763
TT0116 #01 Y:2013 Optimize plant power factor $1,609 $5,920
WV0428 #18 Y:2011 Install occupancy sensors $391 $770
WV0428 #17 Y:2011 Remove or close off unneeded compressed air lines $860 -
WV0428 #16 Y:2011 Utilize energy-efficient belts and other improved mechanisms $2,125 $3,000
WV0428 #15 Y:2011 Reduce the pressure of compressed air to the minimum required $2,154 $25
WV0428 #14 Y:2011 Reduce space conditioning during non-working hours $4,082 $600
WV0428 #13 Y:2011 Utilize higher efficiency lamps and/or ballasts $4,404 -
WV0428 #12 Y:2011 Install compressor air intakes in coolest locations $5,254 $3,010
WV0428 #11 Y:2011 Insulate bare equipment $5,623 $1,890
WV0428 #10 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $7,120 $700
WV0428 #09 Y:2011 Establish a predictive maintenance program $7,253 $2,000
WV0428 #08 Y:2011 Use waste heat from hot flue gases to preheat $8,061 $8,550
WV0428 #07 Y:2011 Eliminate or reduce compressed air usage $8,107 $9,060
WV0428 #06 Y:2011 Analyze flue gas for proper air/fuel ratio $9,763 $1,000
WV0428 #05 Y:2011 Develop a repair/replace policy $11,317 $815
WV0428 #04 Y:2011 Use or replace with energy efficient substitutes $12,157 $24,000
WV0428 #03 Y:2011 Utilize higher efficiency lamps and/or ballasts $40,236 $60,550