Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0232 #11 Y:2003 Pay bills on time to avoid late fees $214 -
BD0232 #10 Y:2003 Minimize water usage $592 $1,265
BD0232 #09 Y:2003 Contract a wood pallet recycling company $1,450 $1,000
BD0232 #08 Y:2003 Lease / purchase baler; sell cardboard to recycler $9,224 $5,500
BD0232 #07 Y:2003 Utilize energy-efficient belts and other improved mechanisms $527 $140
BD0232 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $513 $195
BD0232 #05 Y:2003 Install occupancy sensors $574 $1,050
BD0232 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $794 $700
BD0232 #03 Y:2003 Use most efficient type of electric motors $1,485 $3,400
BD0232 #02 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,559 $2,240
BD0232 #01 Y:2003 Reduce the pressure of compressed air to the minimum required $1,953 -
LM0056 #10 Y:2003 Keep doors and windows shut when not on use $356 -
LM0056 #09 Y:2003 Insulate bare equipment $3,504 $1,726
LM0056 #08 Y:2003 Train operators for maximum operating efficiency $35,000 $28,714
LM0056 #07 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $3,330 $6,675
LM0056 #06 Y:2003 Use most efficient type of electric motors $1,754 $1,968
LM0056 #05 Y:2003 Replace existing equipment with more suitable substitutes $450,000 $20,000
LM0056 #04 Y:2003 Optimize production lot sizes and inventories $300,000 $5,000
LM0056 #03 Y:2003 Replace electrically-operated equipment with fossil fuel equipment $1,371 $1,200
LM0056 #02 Y:2003 Utilize daylight whenever possible in lieu of artificial light $7,713 -