ITAC Assessment: LM0056
ITAC logo
ITAC Assessment: LM0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Brass/Bronze Castings
NAICS 331529: Other Nonferrous Metal Foundries (except Die-Casting)
SIC 3366: Copper Foundries
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 80,820
ft2
Annual Production 2,500
ton
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,082 5,210,800
kWh
Electricity Fees $166,404 -
Natural Gas $31,967 5,303
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $806,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,587 $690 $3,587
29,874
kWh
- - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,713 - $7,713
55,198
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,371 $1,200 $1,555
12,650
kWh
$(-184.0)
-
MMBtu
- -
04 4.321: Optimize production lot sizes and inventories $300,000 $5,000 - - - $300,000
05 4.652: Replace existing equipment with more suitable substitutes $450,000 $20,000 n/a - - - $450,000
06 2.4133: Use most efficient type of electric motors $1,754 $1,968 $1,754
14,262
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,330 $6,675 $3,330
27,228
kWh
- - -
08 4.431: Train operators for maximum operating efficiency $35,000 $28,714 n/a - - $35,000 -
09 2.2511: Insulate bare equipment $3,504 $1,726 - $3,504
-
MMBtu
- -
10 2.7442: Keep doors and windows shut when not on use $356 - - $356
-
MMBtu
- -
TOTAL RECOMMENDED $806,615 $65,973 $17,939
139,212
kWh
$3,676
-
MMBtu
$35,000 $750,000
TOTAL IMPLEMENTED $11,300 $690 $11,300
85,072
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs