Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper foundries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0336 #07 Y:2007 Reduce illumination to minimum necessary levels $3,932 $1,000
UM0336 #06 Y:2007 Install occupancy sensors $6,297 $1,600
UM0336 #05 Y:2007 Install vinyl strip / high speed / air curtain doors $6,239 $10,900
UM0336 #04 Y:2007 Reduce ventilation air $8,256 $2,001
UM0336 #03 Y:2007 Use proper thickness of insulation on building envelope $13,866 $29,119
UM0336 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $17,116 $200
UM0336 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $31,330 $1,650
WV0375 #19 Y:2007 Reschedule plant operations or reduce load to avoid peaks $2,275 -
WV0375 #18 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,797 $10,125
WV0375 #17 Y:2007 Install compressor air intakes in coolest locations $2,975 $652
WV0375 #16 Y:2007 Reduce the pressure of compressed air to the minimum required $4,374 $52
WV0375 #15 Y:2007 Upgrade controls on compressors $7,595 $4,650
WV0375 #14 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $12,983 $772
WV0375 #13 Y:2007 Analyze flue gas for proper air/fuel ratio $29,817 $2,000
WV0375 #12 Y:2007 Develop a repair/replace policy $32,477 $1,338
WV0375 #11 Y:2007 Use optimum thickness insulation $33,427 $6,567
WV0375 #10 Y:2007 Recover waste heat from equipment $34,143 $15,525
WV0375 #09 Y:2007 Use demand controller or load shedder $57,494 $25,520
WV0375 #08 Y:2007 Use waste heat from flue gases to heat space conditioning air $59,537 $62,535
WV0375 #07 Y:2007 Use radiant heater for spot heating $23,729 $37,200