Assessment Year | 2008 |
---|---|
Principal Product | Brass Fluid Connectors |
NAICS | 331529: Other Nonferrous Metal Foundries (except Die-Casting) |
SIC | 3366: Copper Foundries |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
190,000
ft2
|
Annual Production | 20,800,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $511,447 | 10,212,168 |
kWh
|
$0.050 |
Electricity Demand | $200,966 | 20,170 |
kW-mo/yr
|
$9.96 |
Electricity Fees | $24,547 | - |
|
- |
Natural Gas | $71,283 | 8,439 |
MMBtu
|
$8.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,675 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $31,330 | $1,650 |
$22,801
445,308
kWh
|
$8,529
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,116 | $200 |
$12,381
247,299
kWh
|
$4,735
-
kW-mo/yr
|
- | |
03 | 2.7492: Use proper thickness of insulation on building envelope | $13,866 | $29,119 | - | - |
$13,866
-
MMBtu
|
|
04 | 2.7314: Reduce ventilation air | $8,256 | $2,001 | - | - |
$8,256
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,239 | $10,900 | - | - |
$6,239
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $6,297 | $1,600 |
$6,297
125,736
kWh
|
- | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $3,932 | $1,000 |
$2,844
56,784
kWh
|
$1,088
-
kW-mo/yr
|
- | |
08 | 2.6218: Turn off equipment when not in use | $2,766 | $260 |
$2,766
55,224
kWh
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $93 | $93 | - | - |
$93
-
MMBtu
|
|
TOTAL RECOMMENDED | $89,895 | $46,823 |
$47,089
930,351
kWh
|
$14,352
-
kW-mo/yr
|
$28,454
-
MMBtu
|
||
TOTAL IMPLEMENTED | $58,675 | $4,450 |
$44,323
875,127
kWh
|
$14,352
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs