ITAC Assessment: KU0111
ITAC logo
ITAC Assessment: KU0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PRINTING INKS, VARNISHES
NAICS
n/a
SIC 2893: Printing Ink
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,994 432,005
kWh
Natural Gas $21,726 4,067
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $358 $600 - $358
-
MMBtu
02 2.2511: Insulate bare equipment $272 $391 - $272
-
MMBtu
03 2.1123: Install automatic stack damper $246 $400 - $246
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $214 $200 - $214
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $564 $438 $564
6,741
kWh
-
06 2.6121: Reduce hot water temperature to the minimum required $214 - $171
2,052
kWh
$43
-
MMBtu
TOTAL RECOMMENDED $1,868 $2,029 $735
8,793
kWh
$1,133
-
MMBtu
TOTAL IMPLEMENTED $214 $200 - $214
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs