Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drawing and insulating of nonferrous wire
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0770 #11 Y:2018 Reduce illumination to minimum necessary levels $175 -
AM0770 #10 Y:2018 Turn off equipment when not in use $300 -
AM0770 #09 Y:2018 Reduce the pressure of compressed air to the minimum required $1,010 $90
AM0770 #08 Y:2018 Use synthetic lubricant $794 -
AM0770 #07 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $500
AM0770 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,700 $675
AM0770 #05 Y:2018 Optimize plant power factor $5,940 $9,940
AM0770 #04 Y:2018 Optimize plant power factor $8,810 $11,400
AM0770 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $11,260 $27,700
AM0770 #02 Y:2018 Reduce the pressure of compressed air to the minimum required $16,150 $2,050
AM0770 #01 Y:2018 Optimize plant power factor $28,900 $38,900
AM0270 #11 Y:1996 Reuse / recycle/ sell paper products $440 -
AM0270 #10 Y:1996 Use a less expensive method of waste removal $860 -
AM0270 #09 Y:1996 Make a practice of turning off lights when not needed $100 -
AM0270 #08 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $370 $300
AM0270 #07 Y:1996 Reduce illumination to minimum necessary levels $370 $120
AM0270 #06 Y:1996 Pay utility bills on time $508 -
AM0270 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $720 $1,570
AM0270 #04 Y:1996 Combine utility meters $1,390 $500
AM0270 #03 Y:1996 Install skylights $1,435 $2,870