Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Secondary smelting and refining of nonferrous
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0235 #12 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $6,006 $1,000
LE0235 #11 Y:2006 Repair faulty insulation in furnaces, boilers, etc $9,908 $7,500
LE0235 #10 Y:2006 Preheat combustion air with waste heat $11,211 $15,000
LE0235 #09 Y:2006 Use / purchase optimum sized compressor $12,444 $6,000
LE0235 #08 Y:2006 Redesign process $19,713 $1,000
LE0235 #07 Y:2006 Repair faulty insulation in furnaces, boilers, etc $22,786 $30,000
LE0235 #06 Y:2006 Adjust burners for efficient operation $63,349 $20,000
LE0235 #05 Y:2006 Adjust burners for efficient operation $66,844 $100
LE0235 #04 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $73,559 $36,000
LE0235 #03 Y:2006 Upgrade obsolete equipment $192,971 $250,000
LE0235 #02 Y:2006 Preheat combustion air with waste heat $202,503 $95,000
LE0235 #01 Y:2006 Consider use / purchase of bulk materials where possible $1,380,000 $3,000,000
WV0122 #08 Y:1997 Move product using mechanical means $104,000 $3,000
WV0122 #07 Y:1997 Install automatic packing equipment $20,000 $90,000
WV0122 #06 Y:1997 Lease / purchase baler; sell cardboard to recycler $56 -
WV0122 #05 Y:1997 Eliminate/reduce an operation $380,000 $90,000
WV0122 #04 Y:1997 Reuse / recycle/ sell paper products $125 -
WV0122 #03 Y:1997 Install compressor air intakes in coolest locations $273 $212
WV0122 #02 Y:1997 Reduce illumination to minimum necessary levels $8,803 $1,000
WV0122 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $87,836 $3,232