20
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0235 #12 Y:2006 | 12 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,006 | $1,000 | |
| LE0235 #11 Y:2006 | 11 | 2006 | Repair faulty insulation in furnaces, boilers, etc | $9,908 | $7,500 | |
| LE0235 #10 Y:2006 | 10 | 2006 | Preheat combustion air with waste heat | $11,211 | $15,000 | |
| LE0235 #09 Y:2006 | 09 | 2006 | Use / purchase optimum sized compressor | $12,444 | $6,000 | |
| LE0235 #08 Y:2006 | 08 | 2006 | Redesign process | $19,713 | $1,000 | |
| LE0235 #07 Y:2006 | 07 | 2006 | Repair faulty insulation in furnaces, boilers, etc | $22,786 | $30,000 | |
| LE0235 #06 Y:2006 | 06 | 2006 | Adjust burners for efficient operation | $63,349 | $20,000 | |
| LE0235 #05 Y:2006 | 05 | 2006 | Adjust burners for efficient operation | $66,844 | $100 | |
| LE0235 #04 Y:2006 | 04 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $73,559 | $36,000 | |
| LE0235 #03 Y:2006 | 03 | 2006 | Upgrade obsolete equipment | $192,971 | $250,000 | |
| LE0235 #02 Y:2006 | 02 | 2006 | Preheat combustion air with waste heat | $202,503 | $95,000 | |
| LE0235 #01 Y:2006 | 01 | 2006 | Consider use / purchase of bulk materials where possible | $1,380,000 | $3,000,000 | |
| WV0122 #08 Y:1997 | 08 | 1997 | Move product using mechanical means | $104,000 | $3,000 | |
| WV0122 #07 Y:1997 | 07 | 1997 | Install automatic packing equipment | $20,000 | $90,000 | |
| WV0122 #06 Y:1997 | 06 | 1997 | Lease / purchase baler; sell cardboard to recycler | $56 | - | |
| WV0122 #05 Y:1997 | 05 | 1997 | Eliminate/reduce an operation | $380,000 | $90,000 | |
| WV0122 #04 Y:1997 | 04 | 1997 | Reuse / recycle/ sell paper products | $125 | - | |
| WV0122 #03 Y:1997 | 03 | 1997 | Install compressor air intakes in coolest locations | $273 | $212 | |
| WV0122 #02 Y:1997 | 02 | 1997 | Reduce illumination to minimum necessary levels | $8,803 | $1,000 | |
| WV0122 #01 Y:1997 | 01 | 1997 | Utilize higher efficiency lamps and/or ballasts | $87,836 | $3,232 |