ITAC Assessment: LE0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aluminum log billet and extrusions
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 115,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,741 9,008,640
kWh
Electricity Demand $177,506 17,613
kW-mo/yr
Natural Gas $1,806,565 214,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,061,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $576,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.211: Consider use / purchase of bulk materials where possible $1,380,000 $3,000,000 - - - - $1,380,000
02 2.2442: Preheat combustion air with waste heat $202,503 $95,000 - - $202,503
-
MMBtu
- -
03 2.4321: Upgrade obsolete equipment $192,971 $250,000 - - $7,202
-
MMBtu
$13,269 $172,500
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,559 $36,000 $44,853
996,724
kWh
$28,706
-
kW-mo/yr
- - -
05 2.1133: Adjust burners for efficient operation $66,844 $100 - - $66,844
-
MMBtu
- -
06 2.1133: Adjust burners for efficient operation $63,349 $20,000 - - $63,349
-
MMBtu
- -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $22,786 $30,000 - - $22,786
-
MMBtu
- -
08 2.5194: Redesign process $19,713 $1,000 - - $19,713
-
MMBtu
- -
09 2.4226: Use / purchase optimum sized compressor $12,444 $6,000 $8,703
193,395
kWh
$3,741
-
kW-mo/yr
- - -
10 2.2442: Preheat combustion air with waste heat $11,211 $15,000 - - $11,211
-
MMBtu
- -
11 2.1131: Repair faulty insulation in furnaces, boilers, etc $9,908 $7,500 - - $9,908
-
MMBtu
- -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,006 $1,000 $4,550
101,118
kWh
$1,456
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $2,061,294 $3,461,600 $58,106
1,291,237
kWh
$33,903
-
kW-mo/yr
$403,516
-
MMBtu
$13,269 $1,552,500
TOTAL IMPLEMENTED $576,811 $409,600 $13,253
294,513
kWh
$5,197
-
kW-mo/yr
$372,592
-
MMBtu
$13,269 $172,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs