ITAC Assessment: WV0122
ITAC logo
ITAC Assessment: WV0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aluminum Oxides and Hydrates
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 180,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,957 4,086,167
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $601,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $87,836 $3,232 $87,836
1,339,390
kWh
- - -
02 2.7111: Reduce illumination to minimum necessary levels $8,803 $1,000 $8,803
134,232
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $273 $212 $273
4,103
kWh
- - -
04 3.5217: Reuse / recycle/ sell paper products $125 - - $125 - -
05 3.1161: Eliminate/reduce an operation $380,000 $90,000 - - - $380,000
06 3.5315: Lease / purchase baler; sell cardboard to recycler $56 - - $56 - -
07 4.441: Install automatic packing equipment $20,000 $90,000 - - - $20,000
08 4.423: Move product using mechanical means $104,000 $3,000 - - $104,000 -
TOTAL RECOMMENDED $601,093 $187,444 $96,912
1,477,725
kWh
$181 $104,000 $400,000
TOTAL IMPLEMENTED $96,820 $4,232 $96,639
1,473,622
kWh
$181 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs