| Assessment Year | 1996 |
|---|---|
| Principal Product | Fiberglass Boats |
| NAICS |
n/a
|
| SIC | 3732: Boat Building and Repairing |
| Sales Range | $10 M to 50M |
| # of Employees | 152 |
| Plant Area |
250,000
ft2
|
| Annual Production | 250
pieces
|
| Production Hrs. Annual | 5,330
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $91,224 | 1,645,369 |
kWh
|
$0.055 |
| Electricity Demand | $22,784 | 4,810 |
kW-mo/yr
|
$4.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,354 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $1,365 | - |
$1,143
20,809
kWh
|
$222
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $2,698 | $3,997 |
$2,197
39,859
kWh
|
$501
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $4,777 | $4,300 |
$3,150
57,151
kWh
|
$1,627
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,879 | $1,000 |
$3,879
56,272
kWh
|
- | - | - | - | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $16,182 | $7,020 | - | - |
$9,563
-
lb
|
- | - | $6,619 | |
| 06 | 3.8132: Use less toxic and volatile solvent substitutes | $13,190 | - | - | - | - |
$4,800
-
lb
|
$8,390 | - | |
| TOTAL RECOMMENDED | $42,091 | $16,317 |
$10,369
174,091
kWh
|
$2,350
-
kW-mo/yr
|
$9,563
-
lb
|
$4,800
-
lb
|
$8,390 | $6,619 | ||
| TOTAL IMPLEMENTED | $11,354 | $9,297 |
$9,226
153,282
kWh
|
$2,128
-
kW-mo/yr
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs