12
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0385 #08 Y:2004 | 08 | 2004 | Install / repair insulation on steam lines | $339 | $150 | |
| AS0385 #07 Y:2004 | 07 | 2004 | Reduce the pressure of compressed air to the minimum required | $2,939 | $60 | |
| AS0385 #06 Y:2004 | 06 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $383 | $30 | |
| AS0385 #05 Y:2004 | 05 | 2004 | Turn off equipment when not in use | $719 | $506 | |
| AS0385 #04 Y:2004 | 04 | 2004 | Reprocess spent oils on site for re-use | $42,444 | $17,685 | |
| AS0385 #03 Y:2004 | 03 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $59,563 | $24,322 | |
| AS0385 #02 Y:2004 | 02 | 2004 | Eliminate/reduce an operation | $151,757 | $37,000 | |
| AS0385 #01 Y:2004 | 01 | 2004 | Use waste heat from hot flue gases to preheat | $21,304 | $10,000 | |
| AS0036 #04 Y:1991 | 04 | 1991 | Reduce the pressure of compressed air to the minimum required | $1,865 | $40 | |
| AS0036 #03 Y:1991 | 03 | 1991 | Utilize energy-efficient belts and other improved mechanisms | $576 | - | |
| AS0036 #02 Y:1991 | 02 | 1991 | Use most efficient type of electric motors | $915 | $1,193 | |
| AS0036 #01 Y:1991 | 01 | 1991 | Use adjustable frequency drive or multiple speed motors on existing system | $5,560 | $7,995 |