Assessment Year | 1991 |
---|---|
Principal Product | ALUMINUM CASTINGS |
NAICS |
n/a
|
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 74,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,805,552 | 31,210,141 |
kWh
|
$0.058 |
Natural Gas | $125,414 | 62,707 |
MMBtu
|
$2.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,916 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,560 | $7,995 |
$5,560
96,131
kWh
|
|
02 | 2.4133: Use most efficient type of electric motors | $915 | $1,193 |
$915
15,826
kWh
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $576 | - |
$576
9,965
kWh
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,865 | $40 |
$1,865
32,239
kWh
|
|
TOTAL RECOMMENDED | $8,916 | $9,228 |
$8,916
154,161
kWh
|
||
TOTAL IMPLEMENTED | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs