ITAC Assessment: AS0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product METAL STAMPING
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 2,400,000
pieces
Production Hrs. Annual 3,328
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,463 254,103
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $432 $63 $432
4,982
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,895 $500 $2,895
32,825
kWh
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $3,235 $2,000 $3,235
36,635
kWh
04 2.4133: Use most efficient type of electric motors $29 $72 $29
293
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $349 - $349
4,103
kWh
TOTAL RECOMMENDED $6,940 $2,635 $6,940
78,838
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs